Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Using LEED CI IEQc 4.5

NC-2009 IDc1:Innovation in design
posted by  Nelina Loiselle  on 

Has anyone has success getting an ID Credit for a LEED NC 2009 project by pursuing the LEED CI IEQc 4.5 which requires the purchasing of Greengaurd certfied furniture?

3
Default Avatar
Built Environment Professional
Built Kansas City LLC
LEEDuser Basic Member
28 thumbs up
Wed Aug 22, 2012, 9:39 pm

IEQc1 Language

CI-2009 IEQc1:Outdoor air delivery monitoring
posted by  John Kitsalis  on 

Hello, I understand the part of the credit involving CO2 sensors but do not understand the language involving the outdoor airflow measurement device: "Complete Table IEQc1-2 for all mechanical ve

3
Default Avatar
Principal
New England Engineering, Inc.
LEEDuser Basic Member
2 thumbs up
Wed Aug 22, 2012, 9:30 pm

SRI Testing for Concrete?

NC-2009 SSc7.1:Heat island effect - nonroof
posted by  Christina Grierson  on 

Do you have to submit concrete for SRI testing if in the LEED-NC reference table it is listed as 35 for (new gray)? Also, do they count the intitial value or the aged 3 year value?

3
onwer and principal
ecocentric (pty) ltd.
LEEDuser Basic Member
84 thumbs up
Wed Aug 22, 2012, 3:56 pm

MRT and Surface Temp.

NC-2009 IEQc7.1:Thermal comfort - design
posted by  Eric Morrow  on 

Can anyone point me towards a protocol for establishing correct values to be used in the MRT (mean radiant temperature) sheet of the ASHRAE Thermal Comfort Tool 2.0? It asks for the temp.

3
Default Avatar
Architect
Dore & Whittier Architects, Inc.
LEEDuser Basic Member
0 thumbs up
Tue Aug 21, 2012, 6:14 pm

EAp1 Fundamental commissioning domestic hot water question

NC-2009 EAp1:Fundamental commissioning of building energy systems
posted by  Andrew Cooper  on 

Hello, I have a project in which I commissioned and the review comments came back that I did not include the kitchen sinks in my scope of work for the domestic hot water systems?

2
Director of Operations
Transwestern Sustainability Services
LEEDuser Basic Member
355 thumbs up
Mon Aug 20, 2012, 12:11 pm

Air recirculation and outdoor air

NC-2009 EAc1:Optimize energy performance
posted by  Francesco Passerini  on 

I have some doubts concerning air loops of the baseline model, system 5 (Packaged VAV with Reheat). Paragraph G3.1.3.13 “VAV Flow Minimum Flow Setpoints” states: “Minimum volume setpoints for VAV r

5
Fri Aug 17, 2012, 6:42 pm

Non-Densely Occupied Space Ventilation

Schools-2009 IEQc1:Outdoor air delivery monitoring
posted by  Ara Massey  on 

The form for IEQc1 asks you to fill out table IEQc1-1 for all mechanical ventilation systems where 20% or more of the design supply airflow serves non-densely occupied spaces.

3
Default Avatar
Principal
New England Engineering, Inc.
LEEDuser Basic Member
2 thumbs up
Fri Aug 17, 2012, 5:51 pm

Ready Mixed Mortar

CS-2009 IEQc4.1:Low-emitting materials - adhesives and sealants
posted by  Maya Karkour  on 

Dear all, Does "ready mixed mortar" need to comply with the maximum VOC requirements of this credit?

3
Wed Aug 15, 2012, 7:33 pm

ASHRAE 62.1 Item 5.9 - Minimum filtration required

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Carolina Vergnano  on 

Is it required to meet the filtration requirement of ASHRAE 62.1-2007, item 5.9 for equipment areas with no occupation?

2
Wed Aug 15, 2012, 6:16 pm

Baseline System for Warehouse Shell

CS-2009 EAp2:Minimum energy performance
posted by  Tony Schafer  on 

Wondering how to determine the baseline system for a warehouse that upon initial completion will be a cold, dark shell maintained at 50°F.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Wed Aug 15, 2012, 5:31 pm