Forum quick links
Additional Guidance Documents
NC-2009 WEp1:Water use reductionposted by Sonrisa Lucero on
Many times USGBC issues new guidance for particular credits or systems, etc. How are people finding this documentation in a timely fashion? Do you check the website weekly?
Flat and non-flat
CI-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Marco Abdallah on
I want to appologize if the answer on my question is to obvious but I currently have a language problem: 1. Here "flat" is meant in terms of brilliance / glossy? 2.
Spackle
CS-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Mathilda Jonsson on
Hi I'm wondering where in IEQc4 spackle should be included in, IEQc4.1 or IEQc4.2?
System type for process heat exchanger
NC-2009 EAc1:Optimize energy performanceposted by David Weigel, PE on
Hi Group, I searched posts and couldn't find anything like this that has already been answered. I have a proposed 2000+ ton chilled water system in a building, which will be modeled as system 7 i
Multiple fixture types in a common space
EBOM-2009 WEp1:Minimum indoor plumbing fixture and fitting efficiencyposted by Zachary Goodnough on
In each bathroom of our project building there are 5 blow-out fixtures and 1 standard water closet that is handicapped accessible. The two types of fixtures have different flush rates.
Cementitious tile adhesive
CS-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Joanna Bloniewska on
Does cementitious tile adhesive need to comply with VOC requirements of this credit? The adhesive is purchased as a dry powder and mixed on site by adding water.
WD-40 VOCs
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Monica Miller on
We have a job that we need to use WD-40 on. They have provided their VOC level of 50% VOC by weight or 412 g/l.
FSC Certified Products - Documentation?
EBOM-2009 MRc3:Sustainable purchasing - facility alterations and additionsposted by Simon Sue on
In some of our current EB:O&M projects we have considered pursuing the MRc1 and MRc3 purchasing credits, claiming credit for FSC certified materials. How do we document compliance for these pu
Occupancy Sensors in Mechanical Rooms
CI-2009 EAc1.2:Optimize energy performance - lighting controlsposted by Victoria Robertson on
I am working on a LEED-CI project that has a large room used for mechanical equipment and general storage.
Modeling a Natural Ventilation Building
NC-2009 EAc1:Optimize energy performanceposted by Carolina Vergnano on
Hi, I'm working in a project that has 4 conditioned office rooms, which are enclosed by walls, and a café (adjacent to the office) that is natural ventilated.