Adhesive for raised floors

CS-2009 IEQc4.1:Low-emitting materials - adhesives and sealants
posted by  Alicja Bieszyńska  on 

I have a problem with qualifying an adhesive for raised floors systems and finding the appropriate VOC limit. The adhesive is used to stabilize pedestals to concrete slab.

2
Sustainability Consultant
Skanska Czech Republic
LEEDuser Basic Member
128 thumbs up
Tue Jun 5, 2012, 2:20 pm

technical floor

NC-2009 EAp2:Minimum energy performance
posted by  Tarek Dalati  on 

In the building we are modeling there are some technical floor among conditioned floors for example between the 9th and the 11 th floor which are conditioned there is a tehcnical floor which is nei

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Tue Jun 5, 2012, 1:26 pm

Frosted Glazing?

CI-2009 IEQc8.2:Daylight and views - views
posted by  Truex Cullins  on 

We are attempting IEQ 8.2 for LEED CI. Would a 49" tall frosted glass panel partition comply with the intent of this credit?

7
Default Avatar
Webmaster
Perkins+Will
LEEDuser Basic Member
11 thumbs up
Tue Jun 5, 2012, 12:38 pm

Waste Recycling Area

CI-2009 MRp1:Storage and collection of recyclables
posted by  Seung Shin Na  on 

Our project boundary is limited to building only excluding land area. One problem is..waste collection area is installed outside.

6
Sustainability Specialist
Wight and Company
LEEDuser Basic Member
415 thumbs up
Tue Jun 5, 2012, 2:30 am

Steel

NC-2009 MRc5:Regional materials
posted by  Lu Anne Nielsen  on 

I've heard that the location should be taken from where the steel in formed (manfactured) to determine the milage for Regional Materials since it is difficult to document the extraction location.

2
Environmental Business Development- LEED AP BD&C
Nucor Corporation
LEEDuser Basic Member
132 thumbs up
Mon Jun 4, 2012, 9:24 pm

Multiple Use Highrise Baseline Building(s)

NC-2009 EAp2:Minimum energy performance
posted by  Wes Lawson  on 

Hello, We have a situation where we are attempting to model a highrise building of approximately 450,000 square feet. The predominant use of this building is residential.

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Mon Jun 4, 2012, 6:15 pm

spaces,zones and systems in the energy model

NC-2009 EAp2:Minimum energy performance
posted by  Tarek Dalati  on 

do the spaces,zones and air systems in the baseline should have the same names as in the proposed design and the ones in the upploaded drawings? in the mechanical equipments schedules the engineer

3
Default Avatar
Sustainbility manager
CRHI
LEEDuser Basic Member
70 thumbs up
Mon Jun 4, 2012, 5:01 pm

electrical room/swimming pools cooling

NC-2009 EAp2:Minimum energy performance
posted by  Tarek Dalati  on 

is the electrical rooms and internal swimming pools cooling is considered as a process load or not? and what leed reviewer should see in the energy model output. regards

11
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Mon Jun 4, 2012, 2:51 pm

Building Area Method applicable for Multi-use-building

CS-2009 EAp2:Minimum energy performance
posted by  Marco Abdallah  on 

Assuming a 10 storey building where the first three floors are retail floors and the remaining 7 floors are office floors, is it generally possible to use the building area method? Is it possible t

5
Mon Jun 4, 2012, 1:06 pm

Roof Garden over existing building

NC-2009 WEc1:Water efficient landscaping
posted by  Julie Blue  on 

WE have a roof garden that is irrigated over and existing building that is not part of the LEED certification. We are defining a LEED boundary for our 2009-NC project.

2
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Thu May 31, 2012, 8:00 pm