Pilot-Credits PC12:Reduced Automobile Dependenceposted by Tapio Peltonen on
This question applies to Project ID 1000019331 with Pilot Credit 12: Reduced Automobile Dependence. Option 1: Transit-Served Location requires a) A map with building entrance, bus stops and walking
EAp2 - CRAC Units DO NOT Comply!?
CI-2009 EAp2:Minimum energy performanceposted by Graeme Smith on
Hi All, My first post here...
Water feature pumps
CS-2009 EAc1:Optimize energy performanceposted by charles bell on
We are designing a dry water feature on a campus app guide project. The pumps will be on a limited schedule. How will the pumps be factored into the energy credit? thanks for your help
75%
EBOM-2009 MRc8:Solid waste management - durable goodsposted by American University on
We do a good job of tracking the tons of e-waste and furniture that we reuse or recycle, but we don't do a great job of separating the durable goods out of the waste stream to know the weight or am
Separate Heating and Cooling District Energy Systems
NC-2009 EAc3:Enhanced commissioningposted by James Del Monaco on
Our project is located on a University campus with two separate DES buildings. One DES building houses all the chilled water equipment including chillers, pumps, cooling towers, etc.
Case 2 Calculator
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Peter Keithly on
We had to use the Case 2 calculator because our building was too small to qualify for an Energy Star rating.
Tenant's Access to BMS Room
CS-2009 EAc5.2:Measurement and verification - tenant submeteringposted by Maya Karkour on
Dear all, We're developing an M&V Plan for a large commercial mall.
White polyethylene SRI
NC-2009 SSc7.1:Heat island effect - nonroofposted by Guillermo T. Adamo on
Hi, We are pursuing the credit by covering 50% of the parking places with a white polyethylene shade cloth of 70% density.
Timing of IAQ testing compliance
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Anders Olson on
I am part of a LEED NC 2009 for Retail project that intends to pursue Option 2 -- Air Quality Testing -- for this credit.
Flushout calcs for Option 1 Path 1
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Mark Haynie on
To achieve the required time needed for flush out, do we only take into consideration the OA louver volume (CFM)?