E-Waste Line Item Division?

EBOM-2009 MRc8:Solid waste management - durable goods
posted by  Alexis Thompson  on 

Does LEED require that you break out the e-waste into line items and weigh each line item separately (ie "Computer Monitors... 30 lbs", "Copiers...100lbs")?

3
Tue May 1, 2012, 9:07 pm

Restaurant Lighting as a Lease Requirement

NC-2009 IEQc6.1:Controllability of systems - lighting
posted by  Iris Amdur  on 

The only shared multi-occupant space in my project is the Restaurant Dining area. This space will be a tenant fit-out, and until then, temporary lighting fixtures will be installed.

3
Tue May 1, 2012, 6:52 pm

Hazardous materials

NC-2009 MRc2:Construction waste management
posted by  Tanja Arnesson  on 

Hi, I have a question regarding hazardous materials, at one project the review team calculated the combustible materials for energy recovery as hazardous materials and tehrefore I wonder if this i

3
Mon Apr 30, 2012, 3:23 pm

Sylvania Ecologic Lights

EBOM-2009 MRc4:Sustainable purchasing - reduced mercury in lamps
posted by  Patrick Culhane  on 

Our project team considering purchasing ECOLOGIC lamps from Sylvania to fulfill this credit, however we aren’t certain if these are accepted under LEED.

2
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Mon Apr 30, 2012, 1:44 pm

CO2 sensor in kitchen & others

NC-2009 IEQc1:Outdoor air delivery monitoring
posted by  Guillermo T. Adamo  on 

Hi, we are working in a Gas station with three different type of spaces. 1) Individual offices with one or two employees, naturally ventilated.

3
Sun Apr 29, 2012, 5:23 pm

ASHRAE 62.1 Calculator

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Sundararaj Subburaman  on 

Please guide on how to determine Ds - Percent design primary air flow for worst case condition?

7
Principal, Energy and Engineering Leader
DLR Group | Westlake Reed Leskosky
LEEDuser Expert
267 thumbs up
Sat Apr 28, 2012, 1:17 am

The baseline U-values

Schools-2009 EAp2:Minimum energy performance
posted by  Ameet AA  on 

The baseline U-values proposed by ASHRAE 90.1-2007 for a building with high thermal mass in climate zone 1 (see below extracted from table 5.5-1) seem to be too low-performing. Are these correct?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Fri Apr 27, 2012, 11:33 am

Preferred parking outside the LEED boundary

CS-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehicles
posted by  Gabriela Hernández Castillo  on 

Our project's parking goes beyond the LEED boundary, since it is a mixed used building with several towers and only one of them will apply for LEED certification.

4
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Fri Apr 27, 2012, 9:17 am

have 44" to 68" perimeter glazing at a library

NC-2009 IEQc8.2:Daylight and views - views
posted by  Joseph Bace  on 

For only 2" above the 42" sight line requirement do you think a special circumstance is viable for LEED to possibly award the credit or is it better to do the calculations for the standing occupant

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Fri Apr 27, 2012, 5:21 am

DOAS for baseline model

NC-2009 EAp2:Minimum energy performance
posted by  Katherine Ann Resurreccion  on 

If the proposed HVAC design has DOAS that delivers OA to all AHU's, should there be the same auto-sized capacity but the same air flow DOAS for the baseline?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Thu Apr 26, 2012, 11:35 pm