E-Waste Line Item Division?
EBOM-2009 MRc8:Solid waste management - durable goodsposted by Alexis Thompson on
Does LEED require that you break out the e-waste into line items and weigh each line item separately (ie "Computer Monitors... 30 lbs", "Copiers...100lbs")?
Restaurant Lighting as a Lease Requirement
NC-2009 IEQc6.1:Controllability of systems - lightingposted by Iris Amdur on
The only shared multi-occupant space in my project is the Restaurant Dining area. This space will be a tenant fit-out, and until then, temporary lighting fixtures will be installed.
Hazardous materials
NC-2009 MRc2:Construction waste managementposted by Tanja Arnesson on
Hi, I have a question regarding hazardous materials, at one project the review team calculated the combustible materials for energy recovery as hazardous materials and tehrefore I wonder if this i
Sylvania Ecologic Lights
EBOM-2009 MRc4:Sustainable purchasing - reduced mercury in lampsposted by Patrick Culhane on
Our project team considering purchasing ECOLOGIC lamps from Sylvania to fulfill this credit, however we aren’t certain if these are accepted under LEED.
CO2 sensor in kitchen & others
NC-2009 IEQc1:Outdoor air delivery monitoringposted by Guillermo T. Adamo on
Hi, we are working in a Gas station with three different type of spaces. 1) Individual offices with one or two employees, naturally ventilated.
ASHRAE 62.1 Calculator
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Sundararaj Subburaman on
Please guide on how to determine Ds - Percent design primary air flow for worst case condition?
The baseline U-values
Schools-2009 EAp2:Minimum energy performanceposted by Ameet AA on
The baseline U-values proposed by ASHRAE 90.1-2007 for a building with high thermal mass in climate zone 1 (see below extracted from table 5.5-1) seem to be too low-performing. Are these correct?
Preferred parking outside the LEED boundary
CS-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Gabriela Hernández Castillo on
Our project's parking goes beyond the LEED boundary, since it is a mixed used building with several towers and only one of them will apply for LEED certification.
have 44" to 68" perimeter glazing at a library
NC-2009 IEQc8.2:Daylight and views - viewsposted by Joseph Bace on
For only 2" above the 42" sight line requirement do you think a special circumstance is viable for LEED to possibly award the credit or is it better to do the calculations for the standing occupant
DOAS for baseline model
NC-2009 EAp2:Minimum energy performanceposted by Katherine Ann Resurreccion on
If the proposed HVAC design has DOAS that delivers OA to all AHU's, should there be the same auto-sized capacity but the same air flow DOAS for the baseline?