Forum quick links
Services within a college campus
NC-2009 SSc2:Development density and community connectivityposted by Eri Spaulding on
Project I am working on is located within a college campus. Can I count such as a chapel, cafeteria or library as a part of servcie even though they are within the campus?
WE Option 4 or Option 1?
CI-2009 WEp1:Water use reductionposted by Sustentator Argentina on
We are trying to certify a store inside a mall, and are pursuing WEpr1 and WEc1.
skipping RH sensors and getting IEQ 2.3?
EBOM-2009 IEQc2.3:Occupant comfort - thermal comfort monitoringposted by Allen Doyle on
Is it possible that a climate could be benign enough that RH sensors would be redundant or unnecessary, and a project would still gain IEQ 2.3 compliance with temperature monitoring alone? In our s
LEED V2 - NC A Building Housing a CHP Plant for a Campus DES
NC-2009 EAc1:Optimize energy performanceposted by Melissa Crowe on
I have a CHP project that I cannot seem to fit in any one clearly defined compliance path.
Energy Standards Comparison
NC-2009 EAp2:Minimum energy performanceposted by Sam Watters on
Hello, I'm trying to work through how much more efficient my project will be over ASHRAE 90.1 2007, and I wondered if anyone had experience with how the standard compares to IEC 2006. The local b
LEED CS - tenant vs Owner insulation
CS-2009 EAp2:Minimum energy performanceposted by Lawrence Lile on
I am working with an owner who is developing a speculative office building under LEED CS 2009.
Ventilation rate in garage with local code
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Daniel Strömberg on
Dear All, I have a further question about the ventilation rate. I am currently in a LEED project in Europe, which has a garage in the building.
Window Film Adhesive
CI-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Jessica Aubert on
We are working on a CI project which is bounded on three sides by a glass atrium space.
Commissioning of Systems not required in prereq
NC-2009 EAc3:Enhanced commissioningposted by Shauna Sproul on
Can points be achieved in innovation and design for commissioning of systems not required in prereq, for example the building envelope? I understand 2012 is addressing this, but what about 2009? I
CxA designation question
NC-2009 EAc3:Enhanced commissioningposted by Blas Beristain on
Hello! We are involved in a project of a new headquarters of an architectural firm. In this project, the owner will be the architectural firm.