CxA Contract Question
NC-2009 EAc3:Enhanced commissioningposted by Mark Haynie on
We hold a contract for construction of a project as the General Contractor. We also have contracted with the design firm (Architect) for the project.
Round-up
EBOM-2009 SSc3:Integrated pest management, erosion control, and landscape management planposted by SIG - Sustainability Main Account on
I'd like to confirm that Round-Up Pro (EPA # 524-475) is okay to use for weed control in sidewalk cracks.
All indoor water is outside of project owner scope
CS-2009 WEp1:Water use reductionposted by Mary Frances Stotler on
I'm trying to figure out how to document compliance with WEp1 and WEc3. I'm dealing with a situation where all indoor water use is part of the tenant build-out.
Secure bicycle racks and secure bicycle storage
CS-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Caroline Ma on
Any difference between Secure bicycle racks and secure bicycle storage? In CS project with area larger that 300,000 sq.ft. (CS case 2), we need to provide secure bicycle storage.
No Engineer on Project
CI-2009 IEQp1:Minimum indoor air quality performanceposted by Paul Meyer, PE, CEM, CBCP, GBE LEED AP on
All HVAC mechanical systems were existing. Only the ductwork was installed. There is Engineer for this project is there a way to comply without the signature?
Steel Joists & Deck
NC-2009 MRc5:Regional materialsposted by Jeremy Hatfield on
I am a bit confused when it comes to Steel Joist and Deck. New Millennium and Vulcraft obtain steel from mills.
Stated Cost
NC-2009 MRc5:Regional materialsposted by matthew convery on
When calculating both the regional material and recycled content material percentages, do you use the subcontractors cost or can they include their markup?
Using ASHRAE Addenda
CI-2009 EAp2:Minimum energy performanceposted by Luis Miguel Diazgranados on
Hi everybody; The reference guide states "Project teams wishing to use ASHRAE approved addenda for the purposes of this credit may do so at their discretion.
Template issues for Option 1
Schools-2009 IEQp3:Minimum acoustical performanceposted by renee jimenez on
Per the LEED reference guide it states that for Option 1 we are to “Confirm that 100% of all ceiling areas (excluding lights, diffusers and grilles) in all classrooms and core learning spaces are f
Alternative Commuting
EBOM-2009 SSc4:Alternative commuting transportationposted by Aron Weis on
Does the fact that 80% of the people in the building I am evaluating for LEED-EB have FlexFuel cars help? Even if they do not use FlexFuel (Ethanol 85)?