Sample of Measurement and Verification report for Option B?

NC-2009 EAc5:Measurement and verification
posted by  Eric JS   on 

Dear all, Do you have any sample of Measurement and Verifiation report for Option B? Thank you and cheers!

3
Architect / LEED AP BD+C
KILTIK Consultoría
LEEDuser Basic Member
36 thumbs up
Tue Mar 20, 2012, 7:04 pm

Core Performance Guide Requirements for Efficiency

CI-2009 EAc1.3:Optimize energy performance - HVAC
posted by  Erik Dyrr  on 

To earn 5 points using Option 1: Equipment Efficiency, systems must comply with the efficiency requirements outlined in the Core Performance Guide.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Tue Mar 20, 2012, 6:17 pm

Energy simulation

CI-2009 EAp2:Minimum energy performance
posted by  Pongthon Junnapat  on 

For LEED ID+C project, Do we have to include the entire building for energy simulation modeling? or just tenant scope of work Thanks in advance

5
Tue Mar 20, 2012, 1:28 pm

Exemplary Performance, Option 2, Path 4 (Non-Roof)

CI-2009 SSc1:Site selection
posted by  Curt Pascoe  on 

This is a follow up to other exemplary performance (EP) discussions that have occurred. I understand that an EP point can be earned under Path 12 of this credit.

2
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Tue Mar 20, 2012, 8:14 am

Corridors in Dwelling Units

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Omer Moltay  on 

Dear All, In a residential building with natural ventilation only, should corridors and entry halls in dwelling units be shown to be provided with outdoor air (meaning complying with requirements

2
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Mon Mar 19, 2012, 10:41 pm

Basic services within the same shopping center

CI-2009 SSc2:Development density and community connectivity
posted by  Alison Y Rivenburgh  on 

The LEED CI 2009 reference guide states that the project building itself cannot be considered 1 of the 10 basic services; however in a mixed-use building, a maximum of 1 service wtihin the building

2
Mon Mar 19, 2012, 5:48 pm

Mats

NC-2009 IEQc5:Indoor chemical and pollutant source control
posted by  Sam Keehn  on 

We are working on a Mosque in Qatar. All visitors to the mosque remove their shoes prior to entering the building. We would like to avoid placing mats at the entrance due to aesthetic reasons.

3
Default Avatar
Environmental and Sustainability Manager
Energy Management Services, Int.
LEEDuser Basic Member
41 thumbs up
Mon Mar 19, 2012, 3:33 pm

Water Based Coatings - Can't count the carrier solvent?

NC-2009 MRc5:Regional materials
posted by  Dwayne Fuhlhage  on 

I've been working with a subcontractor regarding the documentation requests for regionally based materials on a Platinum project.

5
Founder & Community Director
Metricorps
LEEDuser Expert
7783 thumbs up
Fri Mar 16, 2012, 8:13 pm

Can title 24-2008 compliance be used in lieu of ASHRAE 90.1-200?

CI-2009 EAc1.3:Optimize energy performance - HVAC
posted by  Leticia SooHoo  on 

I am currently involved in a 200,000SF LEED-CI 2009 project in California. To achieve credit EAc1.3, can title 24-2008 be used in lieu of ASHRAE 90.1-2007? Any advice will be appreciated.

5
Architect, Senior Project Manager
IA Interior Architects
LEEDuser Basic Member
52 thumbs up
Fri Mar 16, 2012, 6:47 pm

Open Office Areas - CO2 monitoring?

NC-2009 IEQc1:Outdoor air delivery monitoring
posted by  Norma Lehman  on 

Our building includes private offices, open office areas, and meeting rooms. We have provided CO2 sensors for meeting rooms that have a density of 25 people per 1000 sf or more.

3
Fri Mar 16, 2012, 5:35 pm