IEQ prerequisite 3

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) control
posted by  ROZANA SILVA  on 

Dear sirs: I was told by the LEEDuser team that I would find updated information related to LEED rating systems, but today I found out that IEQ prerequisite 3 was not included in the Leeduser site.

3
Thu Mar 1, 2012, 9:28 pm

stairs, electrical rooms modeled?

NC-2009 EAp2:Minimum energy performance
posted by  AAME User  on 

A couple of quick reference questions: 1) I have some miscellaneous areas in my project (stairwells, electrical rooms, elevator equipment room) being served by split system AC units and 4-pipe fan

2
Thu Mar 1, 2012, 1:17 pm

High price differences between electricity and fossil fuel

NC-2009 EAp2:Minimum energy performance
posted by  Hélène Vieillefosse  on 

In our building, fossil fuel is 30 time less expensive than electricity.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Thu Mar 1, 2012, 1:15 pm

Buildings with Non-Standard Space Temp/Humidity Conditions

NC-2009 EAc1:Optimize energy performance
posted by  Evelyn Dicks, EI, CxA  on 

I am working on an archive library that requires 50F and 35% RH indoor space conditions.

3
Thu Mar 1, 2012, 1:12 pm

Level of detail needed in ESC?

NC-2009 SSp1:Construction activity pollution prevention
posted by  Patty Breech  on 

This is vaguely referenced in other posts, but I'm still confused: what is the level of detail we need to submit for our written Erosion & Sedimentation Control (ESC) plan?

2
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Wed Feb 29, 2012, 6:13 pm

District Cooling for Humidity Control

NC-2009 EAp2:Minimum energy performance
posted by  Santiago Rodriguez  on 

I am working in a project that has no heating or cooling system, therefore I used the same HVAC system as in the proposed model (system #4: PSZ-HP).

3
Tue Feb 28, 2012, 9:51 pm

Private vs Public Fixtures

CI-2009 WEp1:Water use reduction
posted by  Garrett Billings  on 

I am submitting a LEED CI project in a multi-tenant building and would like to get the points.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Tue Feb 28, 2012, 7:31 pm

Fuel for district energy and electricity

NC-2009 MRc2:Construction waste management
posted by  Tanja Arnesson  on 

Hi, I'm working in Sweden with LEED where we have a different district energy system (very effective and 84% (50% of the people living in Sweden) of the multifamily residents get their heat and ho

8
Default Avatar
LEED BD+C O+M
Carde Ten Architects
LEEDuser Basic Member
74 thumbs up
Mon Feb 27, 2012, 4:18 pm

To include microwaves?

CI-2009 EAc1.4:Optimize energy performance - equipment and appliances
posted by  Simon Ng  on 

Dear All, We are trying to pursue EAc1.4 for our current library proposal.

3
Default Avatar
LEEDuser Basic Member
8 thumbs up
Mon Feb 27, 2012, 2:34 pm

A Learning Center to Support Farming on Prime Farm Land

NC-2009 SSc1:Site selection
posted by  Brooks Critchfield  on 

We have a project in a rural area sited on an existing farm.

3
Sun Feb 26, 2012, 11:06 pm