Forum quick links
Cove lighting as decorative?
NC-2009 EAp2:Minimum energy performanceposted by Orlin Velinov, PE on
Has anybody used the ASHRAE 9.6.2 Additional Interior Lighting Power allowance for cove lighting.
Project eligible for Energy Star but outside US
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Tobias Wolf on
Dear Experts, does anybody know, if I can use the "Case 1" of EAp2 (using Portfolio Manager) or not?
ASHRAE 55 requirement in EAc1.3
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Juliana Malho on
Does anyone knows if ASHRAE 55 is really a requirement for the credit?
Walk off mats (linked to IEQ5)
CI-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by R Jones on
Do projects have to consider the requirements for IEQ4.3 either through the CRI green label plus or other testing method for the walk off mats required under IEQ5 Indoor Chemical Pollutant Source C
IEQ prerequisite 3
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by ROZANA SILVA on
Dear sirs: I was told by the LEEDuser team that I would find updated information related to LEED rating systems, but today I found out that IEQ prerequisite 3 was not included in the Leeduser site.
stairs, electrical rooms modeled?
NC-2009 EAp2:Minimum energy performanceposted by AAME User on
A couple of quick reference questions: 1) I have some miscellaneous areas in my project (stairwells, electrical rooms, elevator equipment room) being served by split system AC units and 4-pipe fan
High price differences between electricity and fossil fuel
NC-2009 EAp2:Minimum energy performanceposted by Hélène Vieillefosse on
In our building, fossil fuel is 30 time less expensive than electricity.
Buildings with Non-Standard Space Temp/Humidity Conditions
NC-2009 EAc1:Optimize energy performanceposted by Evelyn Dicks, EI, CxA on
I am working on an archive library that requires 50F and 35% RH indoor space conditions.
Level of detail needed in ESC?
NC-2009 SSp1:Construction activity pollution preventionposted by Patty Breech on
This is vaguely referenced in other posts, but I'm still confused: what is the level of detail we need to submit for our written Erosion & Sedimentation Control (ESC) plan?
District Cooling for Humidity Control
NC-2009 EAp2:Minimum energy performanceposted by Santiago Rodriguez on
I am working in a project that has no heating or cooling system, therefore I used the same HVAC system as in the proposed model (system #4: PSZ-HP).