Forum quick links
Campuswide and Multi Building Documentation
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Brian Moran on
Does anyone have experience demonstrating compliance for campuswide or multiple buildings? We would like to document this credit for campuswide submission.
Energy Modeling a Concrete Dome
NC-2009 EAc1:Optimize energy performanceposted by Nelina Loiselle on
We are completing an energy model for a concrete dome. We chose the dome structure because it is more energy efficient than conventional building types. This was a design decision.
Ashrae 90.1, section 6.4 minimun equipment efficiencies
CS-2009 EAp2:Minimum energy performanceposted by Agustin Bertolotti on
Hello everyone We have a project in Uruguay in which our clients want to use a 350 tons centrifugal chiller with a 8.41 IPLV and 5.65 COP. Table 6.8.1C shows minimum efficiencies for this chiller
Scope of the policy
EBOM-2009 IEQp3:Green cleaning policyposted by Maya Karkour on
Hello, Our project consists of a building with many different tenancy areas. The core areas are managed by the landlord and have a green cleaning policy.
LEED for Schools - Bike Lane Req. (Sorry for Cross Posting)
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Jean Marais on
Daycare Center - Bike Racks on Lot Boundry My Bicycle Parking Racks are located on the Lot Boundry. On the otherside of the fence, through the always open gates is the public side walk.
FloorScore certification
CI-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Juliana Malho on
Are Limestone and Marmoglass considered as hard flooring system, and thus, has to be FloorScore certified fo IEAc4.3?
Alternative Compliance Path Documentation
CS-2009 WEp1:Water use reductionposted by R Jones on
I wish to pursue an Alternative Compliance Path for taking account of collected rainwater being used for the toilet and urinal flushing under credit WCp1 and WE3.
Central Plant Re-Location
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Reynaldo Castro on
Hello we are a LEED-EB O&M V3 Certified Project and are planning a major remodel of our existing building. Including Re-Location of entire existing central plant.
Exemplary Perfromance
CI-2009 SSc2:Development density and community connectivityposted by Méabh Browne on
Hi, Is it possible to get an ID Exemplary Performance for this credit? I thought it wasn't but the form seems to indicate that it possible. If it is, then what are the requirements? Thanks
Exemplary Performance
Schools-2009 SSc4.1:Alternative transportation - public transportation accessposted by Thorn Grafton on
According to page 46 the LEED reference guide, it states the following: (FOR SCHOOLS - If a school bus system is being counted as 1 of the required bus lines to meet the requirements of Option 2, e