Forum quick links
Recycle Station
CI-2009 MRp1:Storage and collection of recyclablesposted by JENNIFER COMEAU on
There's been a continuous question within our projects regarding the recycling situation.
Both electric heat pump and district energy, what system?
NC-2009 EAp2:Minimum energy performanceposted by Emma Eliasson on
I have a multifamily building which is supplied with heat from both an electric heat pump and district energy. How do I choose between system 1 and 2? Which rules do apply?
Prerequisite Denied
CI-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Ellen Mitchell on
This issue seemed to be in question on a few other posts so I thought I would weigh in on a recent experience.
Applicable standard?
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Veronika Sundberg on
Have anyone used another reference other than the ASHRAE standard 62 for a hospital project. The rooms in our hospital are not compliant with the standard rooms of table 6.1.
Operable windows as controls
CS-2009 IEQc6:Controllability of systems - thermal comfortposted by Amanda Ross on
Just to clarify: Each operable window counts as one control.
ID credit for 100% outside air
NC-2009 IEQc2:Increased ventilationposted by Nelina Loiselle on
I know there is not an exemplary performance for this credit per say, but I am working on a project where we will using 100% outside air...do you think we could attmept an ID point since we are goi
Strand Woven Bamboo
NC-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Kenneth Bailey on
Our project will use considerable amount of strand woven bamboo. .
Building Renovation
CS-2009 EAp2:Minimum energy performanceposted by Morteza Kasmaei on
Advanced Energy Modeling for LEED states "Existing buildings with less than 50% renovation should not be rotated,...". How can one calculates renovation percentage of an existing building?
Temporary Structure Phase 1A question for ESC...
NC-2009 SSp1:Construction activity pollution preventionposted by Rick Alfandre on
We have a project that has multiple phases, the first of which is just a the erection of a temporary retail facility.
non default occupancy numbers
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Veronika Sundberg on
We want to use non default occupancy values for some rooms in our project. Do anyone have experience what the reviewers might have for thoughts regarding this.