Forum quick links
What can we claim?
NC-2009 IDc1:Innovation in designposted by Clare Parry on
Hi all, We have just received our Construction Prelim results and comments.
% Regional
CI-2009 MRc5:Regional materialsposted by Beth Cheuvront on
For this credit the form has three columns - Column 1 - % Regional Colum 2 - Extraction Miles Column 3 - Manufactured miles We are not going for the regionally extracted point only the regional
LED lamp documentation
EBOM-2009 MRc4:Sustainable purchasing - reduced mercury in lampsposted by Erin Holdenried on
I am working on a project whose majority of fixtures are LED. I am wondering what the LED equivalent to a lamp/blub is when documenting this credit.
Credit compliance for a building obstructed by another building
NC-2009 IEQc8.2:Daylight and views - viewsposted by Udana Ratnayake on
We are working on a factory project where the building meets all the requirements stated in the LEED NC Guideline to prove credit compliance.
Baseline Model Exterior Lighting
NC-2009 EAp2:Minimum energy performanceposted by Jean Marais on
Okay, the baseline model has no overhangs and canopies, but the design has.
Health club membership
CI-2009 SSc3.2:Alternative transportation - bicycle storage and changing roomsposted by Sheela I on
If the building has a health/fitness club and is not free to all tenants - does this credit apply?
Kitchens in Residential projects - regularly occupied?
NC-2009 IEQc8.1:Daylight and views - daylightposted by Iris Amdur on
I am working on a residential building, and we are deciding whether or not the kitchens in each residential unit would be included in the daylighting calculations.
Using PHPP for EAp2/EAc1 modeling
NC-2009 EAp2:Minimum energy performanceposted by Lyle Axelarris on
Is it possible to use PHPP software (Passive House Planning Package) for energy modeling on a LEED-NC project? Does anyone have experience with this?
Determining the number of full time equivalent (FTE) occupants
NC-2009 WEc2:Innovative wastewater technologiesposted by Rudolph Schaar on
To determine the demand for water, what number should be used for FTE occupants - the number of occupants that the building is being designed for, or the maximum number of occupants calculated usin
Can rainwater tank be connected to the potable water system?
CS-2009 WEc1:Water efficient landscapingposted by Adam Targowski on
I would like to comply with the requirements of this credit by the use of captured rainwater for irrigation purposes.