Submit in Design review but include manuf. cuts in Const Review
Schools-2009 IEQp3:Minimum acoustical performanceposted by Renee Shirey on
The prereq requires manufacturer cut sheets for the accoustic materials.
Simplified Approach
Schools-2009 IEQp3:Minimum acoustical performanceposted by Jean Marais on
I have a kindergarten, 7440sf, ground level only, all learning spaces are on perimeter with windows. There is only a small road on the one side about 20 m away.
LEED for Retail: CI
CI-2009 SSc2:Development density and community connectivityposted by Kory Beighle on
I am working on a Retail:CI project and we are attempting the documentation for the SSc2 Option 2.
green cleaning in schools
EBOM-2009 IEQp3:Green cleaning policyposted by Lauren Ulmer on
What do you do about achieving this Prereq if the school district requires the use of bleach as a disinfectant?
More than one EP per section?
EBOM-2009 IOc1:Innovation in operationsposted by matthew strong on
Can you have more than one EP per section.....for example for MR credit 2 AND MR credit 6?
Calculating views with casework in the room
NC-2009 IEQc8.2:Daylight and views - viewsposted by Renee Shirey on
In the example (Mt Healthy school) in the Documentation Toolkit section of this credit, the only thing that seems to limit the views is the window locations and the walls.
Exemplary Performance - forms question
NC-2009 MRc2:Construction waste managementposted by André Knutsson on
We have finished the project whith a 97.2 % recycling, and are pursuing the one Innovation in Design credit. When we register the IDc1.1 we do not get to choose the MRc2 in the dropdown window.
Creme Marfil Marble
CI-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Colleen Ice on
I see a lot of threads based on hard surface materials being exempt, but what about marble.
Expected volume of recycling
CI-2009 MRp1:Storage and collection of recyclablesposted by Nina Tallering on
How do I calculate the 'expected volume of recycling'? I realize this is a redundant post/question, however, we continue to receive GBCI preliminary review comments that request the expected volum
landfill has a recycle/reuses program in place
NC-2009 MRc2:Construction waste managementposted by ming zeng on
We have a project that the local landfill has a recycle/reuse program. For example, they will chip out wood and reuse it as road bed materials to build the road system in the landfile.