Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Documentation- No Extraction Location Data

CI-2009 MRc5:Regional materials
posted by  Kellie Hollenbeck  on 

I may have missed this but, what does the project team input in the template if there is no extraction data provided from the manufacturer but they have the manufacturing distance and wish to apply

2
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Mon Sep 12, 2011, 12:53 pm

FSC Controlled label

NC-2009 MRc7:Certified wood
posted by  mary ostafi  on 

LEED v3 clearly states that wood products need to be certified as FSC Pure or FSC Mixed in order to contribute toward this credit.

6
Default Avatar
Sustainability Specialist
HOK
LEEDuser Basic Member
14 thumbs up
Sat Sep 10, 2011, 4:07 pm

Small Sized printers

CI-2009 IEQc5:Indoor chemical and pollutant source control
posted by  Sundararaj Subburaman  on 

I am working on a CI project, which requires small sized printers to placed in the floor area for particular working groups, do we have to consider the small sized printers to be placed inside the

2
Founder & Community Director
Metricorps
LEEDuser Expert
7783 thumbs up
Fri Sep 9, 2011, 10:10 pm

100% Municipal Non-Potable Water

NC-2009 WEc1:Water efficient landscaping
posted by  Michelle Rosenberger  on 

Our project will irrigate with a drip irrigation system using 100% municipally supplied non-potable water.

5
Fri Sep 9, 2011, 6:34 pm

Lighting Controllability in Restaurant Dining & Bar Areas

NC-2009 IEQc6.1:Controllability of systems - lighting
posted by  Karla Fisk  on 

Has anyone ever had a restaurant NC project where you were able to come up with a method of controlling lighting in the dining/bar area? Were you able to achive this credit?

2
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Fri Sep 9, 2011, 4:51 pm

Industrial buildings: EAc1 Optimize Energy Performance

CS-2009 EAc1:Optimize energy performance
posted by  Jane Long  on 

Hi, I’m working on a pre-assessment for a large manufacturing (aircraft) plant.

4
Fri Sep 9, 2011, 3:42 pm

Modeling OA for naturally ventilated space

NC-2009 EAc1:Optimize energy performance
posted by  Orlin Velinov, PE  on 

We have a project that is a parking garage structure.

2
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Thu Sep 8, 2011, 3:04 pm

Energy Modeling: Dome (Design) vs. Dome (Baseline)?

NC-2009 EAc1:Optimize energy performance
posted by  Nelina Loiselle  on 

I am working on the LEED Certification of a 23,000sq.ft. concrete "business continuity" dome. It is literally a concrete dome.

3
Thu Sep 8, 2011, 2:49 pm

green power for residential hi-rise

NC-2009 EAc6:Green power
posted by  Lorey Flick  on 

How can this credit be achieved if the building is a high-rise residential building where all apartments are separately metered? This is a rental building.

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Wed Sep 7, 2011, 11:44 pm

Tenant spaces simulation without HVAC

CS-2009 EAc1:Optimize energy performance
posted by  victor mattos  on 

Does anyone knows if the tenant spaces shall be simulated with HVAC system for a shopping mall or can i just simulate with idealloads? I searched in the LEED Reference guide Appendix 2 but it does

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Wed Sep 7, 2011, 7:06 pm