Forum quick links
LEED Certification for Phase wise construction
NC-2009 MRc4:Recycled contentposted by Ramesh Narayanan on
Dear Sir/Madam, I have few clarification of whether the old constructed portion material should be considered for all the materials credits. Project Details: The building has been developed by t
Option 1
Pilot-Credits PC12:Reduced Automobile Dependenceposted by Jun Hashimoto on
I completed option 1. My LEED-CI project is a confidential project, but is located in a dense urban area with well-developed public transportation.
LEED CS 2009 LEED ENERGY MODEL
CS-2009 EAc1:Optimize energy performanceposted by John Harrington on
My proposed system is a WSHP.
is a closed landfill automatically a brownfield?
NC-2009 SSc3:Brownfield redevelopmentposted by Amanda Redmond-Neal on
My project is to be built on top of a landfill that was closed in 1961.
Region Where LT Leases are NOT Common
CI-2009 MRc1.1:Tenant space - long-term commitmentposted by Raymond Loo on
Has anyone in a region where long term contracts are not common, had experience (of if you have any comments) dealing with USGBC on this credit?
Ventilation Rate Schedule sample
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Nelina Loiselle on
You should update this sample under your rescources section to one that includes an Ev rate.
Equivalent to Green-E
CI-2009 EAc4:Green powerposted by Wayne L. Appleyard on
Has anyone defined this? We are looking at purchasing RECs directly from one or more schools or other non-profits that have not sold RECS.
ASHRAE 62.1-2007 in Warehouses
EBOM-2009 IEQp1:Minimum indoor air quality performanceposted by Prudence Ferreira on
We are working on a project with very large warehouses with massive roof-mounted air handling units and relatively low occupancy. A 60,000 sf facility may only have 8 workers for example.
Lighting Power Density: ASHRAE Lighting Compliance Documentation
CI-2009 EAp2:Minimum energy performanceposted by elizabeth warlop on
Hello, Our project is a small 1300 sqft office space. The only adjustments the clients are making to the lighting is that they are adding task lighting to the newly fabricated work stations.
Option 4 has disappeared from the May 2011 Addenda
NC-2009 SSc4.4:Alternative transportation - parking capacityposted by Deborah Lucking on
Option 4, citing the ITE study is not shown in the May 2011 Addenda. Does anyone know if this was just an omission by mistake, or is this Option no longer valid?