Forum quick links
Tenant Scope, Owner Scope, Tenant Guidelines
CS-2009 EAp2:Minimum energy performanceposted by Jennifer Preston on
I'm sure this questions has be asked before, but I cant seem to find the answer. Do forgive me if its repetitive. Where is the line between tenant scope, owner scope and the Tenant Guidelines?
Athena calculator questions
Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materialsposted by Laura Whitehurst on
1. What is the difference between an open web steel joist and a plain steel joist?
Grasscrete for Fire Lane
NC-2009 SSc5.1:Site development - protect or restore habitatposted by Norma Lehman on
I understand that turf is not compliant "native and adaptive ", but is there an exception for using Grasscrete for the fire lane instead of paving?
Must submeters not within Option 2 list be read weekly?
EBOM-2009 WEc1:Water performance measurementposted by Vanessa Seibert on
We have a main, fire water and irrigation meter. If read weekly and calibrated properly we have what is needed to obtain 2 points in this credit.
PE Stamp on SEP
EBOM-2009 EAc6:Emissions reduction reportingposted by Carrie Bradley on
EAc1 and EAp2 don't require a PE seal. Is it really required on the SEP submittal for this credit?
Weekly Meter Readings
EBOM-2009 WEc1:Water performance measurementposted by Wendy Gibson on
I am wondering if the weekly meter readings need to be done on the same day every week?
VOC limits declaration for European Materials
CS-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Alessio Zampaglione on
Can someone tell me some informations about using materials with VOC limits tested with testing method other than SCAQMD? for example like GEV - EMICODE E1?
Interior Construction
CS-2009 WEp1:Water use reductionposted by Joaquim Lima on
Good morning, My building is a residential building and was certified as core & shell, credit MR - 4 (Recycled Content) there is a paragraph that says interior construction is not part of the
Too much daylight?!?!
Schools-2009 IEQc8.1:Daylight and views - daylightposted by Tyler Barter on
Hello, I am in the process of working on collecting information for LEED certification on 3 different schools that all have large amounts of glass in the cafeteria, gym, and Library, as well as a f
Interior Glazed Walls
NC-2009 IEQc8.1:Daylight and views - daylightposted by Richard Reed on
For prescriptive method 2, We have shallow depth perimeter offices with full height glass walls facing the interior spaces.