Forum quick links
WEp1 Scope or Space?
CI-2009 WEp1:Water use reductionposted by Michelle Bracewell-Musson on
The Bird's Eye above states only fixtures within the project 'SCOPE' which would mean that a project that does not include plumbing fixtures, would be exempt.
Water Use in a Horizontal Expansion
NC-2009 WEp1:Water use reductionposted by Neil Rosen on
What do you do if you are constructing a horizontal expansion but you have no plumbing fixtures in the expansion?
commissioning performance period
EBOM-2009 EAc2.2:Existing building commissioning - implementationposted by Pablo Fortunato Suarez on
This is for a 1st time EBOM project (not recertification). If Six Sigma Projects were initiated 5 years prior to LEED registration but implemented every year thereafter until the present time: 1)
Authority having Jurisdiction
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Diego Prada on
We are working on a CS naturally ventilated office Building.
How to keep birds away from PV panels
Schools-2009 EAc2:On-site renewable energyposted by Gendel Metlitsky on
How to keep birds away from PV panels on the roof - any suggestions?
Lighting Power Density
NC-2009 EAp2:Minimum energy performanceposted by Guillermo T. Adamo on
Hi, im working in the design of a petrol station persuing LEED certification.
Condensate meters
EBOM-2009 WEc1:Water performance measurementposted by Andrea Marzullo on
1. Is anyone using condensate for make-up to their cooling tower? 2. If so, what size and type of meter is being used? 3.
Standard path vs alternative compliance approach?
EBOM-2009 EAp3:Fundamental refrigerant managementposted by Danielle Caestecker on
How do I decide which one to pick?
Exhaust requirement in C&S Building
CS-2009 IEQc5:Indoor chemical and pollutant source controlposted by Rubén M. R. on
We have a C&S building and we asume that it will be occupied by corporate offices.
Change the version of LEED - EB - O & M (V.2008 to v.2009)
EBOM-2009 SSc1:LEED certified design and constructionposted by Paola Figueiredo, Newton Figueiredo on
To whom it may concern, I have a question that I didn not find a solution in the credit-by-credit forum at this website. I have a project LEED-EB-O&M registred in the V.2008 but our client want