Existing refueling station
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Maura Adams on
We have a refueling station on our campus from a previous LEED project. It's about 1/4 mile from the new building and there's a walking path between the two parking areas.
MPR 2
NC-2009 IDc2:LEED Accredited Professionalposted by javier bolanos zeledon on
According to MPR 2, buildings should be constructed on already existing land. On the supplemental guide it states that cantilevered buildings over water, highways, etc, are acceptable.
Which version of Daylight & Views Calculator to use?
NC-2009 IEQc8.1:Daylight and views - daylightposted by Erica Downs on
There are currently a couple of different EQc8 calculator spreadsheets posted on the LEED Online Credit Resource page.
Pilot Credit as ID Credit Only?
Pilot-Credits SSpc7:Light pollution reductionposted by Jonathan Weiss on
I see from the description that Pilot Credits can be achieved only as an ID credit, which leads me to ask: Does that mean that we could get the regular LEED 2009 SSc8 credit, and also this one?
Alernative Compliance Path to SSc5.1
NC-2009 SSc5.1:Site development - protect or restore habitatposted by Taylor Ralph on
Has anyone ever used an Alternative Compliance Path to earn SSc5.1?
Retaining rainwater for future uses
CS-2009 SSc6.1:Stormwater design - quantity controlposted by Gabriela Hernández Castillo on
Will capturing all rainwater and keep it in a tank for future uses such as cooling towers and irrigation? Our project will not infiltrate it but reuse it instead.
Remnant Limestone- any LEED credit there?
CS-2009 MRc3:Materials reuseposted by Julie Hendricks on
My client wants to use remnant limestone (basically pieces of limestone left over when larger pieces are cut) for exterior siding.
Occupancy Sensor
CI-2009 EAp2:Minimum energy performanceposted by Simon Sue on
We have a project which has a big " function" area . this particular area is for employees to hang out + meet up with customers + briefing area (with a formal meeting table, projectors).
EAPr2 - Lighting Control (shut-off control and space control)
CI-2009 EAp2:Minimum energy performanceposted by Ramesh Narayanan on
Could you please anybody elaborate what is the difference between the shut-off device control requirement and speace control device requirement mentioned in the Ashrae standard lighting mandatory p
Interpretation table 5.5-4 ASHRAE 2007 mandatory provisions
NC-2009 EAp2:Minimum energy performanceposted by Vindio Corro on
We are preparing the LEEd for a Stadium in Spain and I have a doubt with the conditioned areas. The level -2 is conditioned and the level -1 (parking) is unconditioned...which is the U-factor we ha