Condensate meters

EBOM-2009 WEc1:Water performance measurement
posted by  Andrea Marzullo  on 

1. Is anyone using condensate for make-up to their cooling tower? 2. If so, what size and type of meter is being used? 3.

2
Founder & CEO, LEED Fellow, BREEAM Fellow
BuildingWise LLC
LEEDuser Expert
224 thumbs up
Fri Apr 29, 2011, 10:34 pm
3
Thu Apr 28, 2011, 1:25 pm

Exhaust requirement in C&S Building

CS-2009 IEQc5:Indoor chemical and pollutant source control
posted by  Rubén M. R.  on 

We have a C&S building and we asume that it will be occupied by corporate offices.

4
Founder & Community Director
Metricorps
LEEDuser Expert
7783 thumbs up
Thu Apr 28, 2011, 12:16 am

Change the version of LEED - EB - O & M (V.2008 to v.2009)

EBOM-2009 SSc1:LEED certified design and construction
posted by  Paola Figueiredo, Newton Figueiredo  on 

To whom it may concern, I have a question that I didn not find a solution in the credit-by-credit forum at this website. I have a project LEED-EB-O&M registred in the V.2008 but our client want

2
Founder & Community Director
Metricorps
LEEDuser Expert
7783 thumbs up
Wed Apr 27, 2011, 10:14 pm

Achieve LEED CI Without any Mech. or Plumb. Changes?

CI-2009 EAp1:Fundamental commissioning of building energy systems
posted by  Michelle Bracewell-Musson  on 

I have been asked to bid a LEED CI project where there will only be flooring, wall relocation, and added ceiling tiles to 7,000 feet of a 50,000 foot office space.

2
Director of Operations
Transwestern Sustainability Services
LEEDuser Basic Member
355 thumbs up
Tue Apr 26, 2011, 4:10 pm

Late Enhanced Comissioning

NC-2009 EAc3:Enhanced commissioning
posted by  Carolina Vergnano  on 

Does exist any time limit between the construction conclusion and the start of enhanced comissioning? i.e.

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Tue Apr 26, 2011, 12:42 pm

All parking underground but one..

CS-2009 SSc7.1:Heat island effect - nonroof
posted by  Mathilda Jonsson  on 

Hi! My project has all parking spaces underground exept for one handicap parking that's situated at the court yard. We really want to go for exemplary performance point and put all under cover.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7783 thumbs up
Tue Apr 26, 2011, 5:57 am

"90% Minimum of building occupants"

NC-2009 IEQc6.1:Controllability of systems - lighting
posted by  Sandra Heiser  on 

The requirement reads " Provide individual lighting controls for 90% (minimum) of the building occupants..." Is this based on the FTE? Or does it mean 90% of the individual workspaces?

2
Founder & Community Director
Metricorps
LEEDuser Expert
7783 thumbs up
Mon Apr 25, 2011, 3:40 pm

WE Prerequisite qualification for a minimal CS project

CS-2009 WEp1:Water use reduction
posted by  Tak Louie  on 

Our client is building a Retail center for a large grocer with small satellite retail spaces. The balance of the building is simply a parking garage with an enclosed and tempered elevator lobby.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7783 thumbs up
Mon Apr 25, 2011, 1:30 pm

Option 3, approach 2: Random selection

EBOM-2009 SSc4:Alternative commuting transportation
posted by  gwenedd murray  on 

This building is over 300,000 sf and located close to public transportation. Half of the tenants are government agencies.

3