Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Gross square footage discrepancy

NC-2009 EAp2:Minimum energy performance
posted by  Aliesa Adelman  on 

If the energy model uses net area instead of the LEED definition of gross floor area, how is this discrepnacy reconciled?

5
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Mon Apr 18, 2011, 9:57 am

Core and Shell Definition

CS-2009 EAc1:Optimize energy performance
posted by  Tom Nichols  on 

Can a building without a core HVAC systems be certified under LEED CS? For example, a two story building with a 6,500 ft2 footprint per floor.

3
Default Avatar
LEED AP (O+M)
4 Elements Group
LEEDuser Basic Member
34 thumbs up
Sun Apr 17, 2011, 6:58 pm

SSc7.2 Inquiry - Subterranean 'Roof'

CS-2009 SSc7.2:Heat island effect - roof
posted by  Patrick MacPherson  on 

Hello, The project I am working on consists of a tower with subterranean spaces that lie beyond the tower's footprint.

5
Default Avatar
Senior Consultant
Sustainable Design Consulting
LEEDuser Basic Member
12 thumbs up
Fri Apr 15, 2011, 2:47 pm

Phase II

Schools-2009 SSp2:Environmental site assessment
posted by  Terry Squyres  on 

If your project finds contamination on site during construction, does remediation have to be complete before the LEED design application can be submitted?

6
Principal
Studio4, LLC
LEEDuser Expert
120 thumbs up
Thu Apr 14, 2011, 3:42 pm

Excluding Casework from IEQc8.1 & IEQc8.2

Schools-2009 IEQc8.1:Daylight and views - daylight
posted by  John Drigot  on 

On a previous LEED for Schools 2009 project I was sucessful in not including the space occupied by built-in casework in the occupied square footage of a space.

2
Wed Apr 13, 2011, 4:22 pm

LEED Boundary and equipment

CS-2009 EAp2:Minimum energy performance
posted by  Gabriela Hernández Castillo  on 

We have a mixed use project with several buildings on it, from which one of them will apply for LEED-CS certification.

2
Tue Apr 12, 2011, 10:16 pm

Occupancy Sensors

NC-2009 IEQc6.1:Controllability of systems - lighting
posted by  Lindsay Duncan  on 

In the past GBCI has stated as a side note: "For future projects, please note that occupancy sensors alone are not an acceptable form of lighting control".

3
Default Avatar
Vice President
Thornton Tomasetti
LEEDuser Premium Member
188 thumbs up
Tue Apr 12, 2011, 8:06 pm

Existing classrooms on an addition

Schools-2009 IEQp3:Minimum acoustical performance
posted by  Joe Piedimonte  on 

We have a project that is an addition to an existing school. The existing classrooms are included in the LEED boundary, but they have only had minor updates of mechanical systems.

2
Daniel Hicks, E.I., INCE
Geiler & Associates
LEEDuser Basic Member
175 thumbs up
Tue Apr 12, 2011, 4:57 pm

Warehouse - Heating Only

NC-2009 EAc1:Optimize energy performance
posted by  Curt Pascoe  on 

There has been much talk that warehouses with heating-only (no cooling) must still model a cooling system in the baseline and proposed case, since the space is defined as conditioned.

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Mon Apr 11, 2011, 2:35 pm

Regularly Occupied Spaces

CI-2009 IEQc8.1:Daylight and views - daylight
posted by  Anya Rose Benkabbou  on 

We are stuggling to define "regularly occupied space".

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Wed Apr 6, 2011, 10:34 pm