Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Tenant space without provision of HVAC system

CS-2009 IEQp1:Minimum indoor air quality performance
posted by  Wei Jiang  on 

For our LEED-CS project, there is no central HVAC system within the buidling.

2
Principal, Energy and Engineering Leader
DLR Group | Westlake Reed Leskosky
LEEDuser Expert
267 thumbs up
Wed Apr 6, 2011, 2:11 am

How to account for telecommuters

EBOM-2009 WEc2:Additional indoor plumbing fixture and fitting efficiency
posted by  Maria Unruh  on 

This might not be the most appropriate credit category to ask this question but it does affect the calculations for this credit. Our project has 21 full time telecommuters.

3
Director of Operations
Transwestern Sustainability Services
LEEDuser Basic Member
355 thumbs up
Tue Apr 5, 2011, 4:19 pm

Zones for a small CI 2.0 Project

CI-2009 IEQp1:Minimum indoor air quality performance
posted by  Greg Hackett  on 

We have an office project (LEED CI 2.0) in an exsitng small building about 3500 s.f. The building is served by one existing central system that provides OA to the space.

3
Default Avatar
RA, LEED AP BD+C
ATA/Beilharz Architects
LEEDuser Basic Member
37 thumbs up
Tue Apr 5, 2011, 12:32 am

Renovation versus Demolition

NC-2009 IDc1:Innovation in design
posted by  sara frye  on 

After much research and discussion it was decided to renovate an extremely decrepit farmhouse, portions of which date back to the 18th century.

3
Mon Apr 4, 2011, 7:36 pm

Option 2: Floor Area Clarification

NC-2009 IEQc8.1:Daylight and views - daylight
posted by  Shannon Terrell  on 

If my bay depth to core is deeper than 2 times the height of the window, is the area beyond 2H still part of the floor area calculation?

2
Senior Project Manager
Zinner Consultants
LEEDuser Basic Member
110 thumbs up
Fri Apr 1, 2011, 10:09 pm

Flowing water Pressure for Kitchen Sink

NC-2009 WEp1:Water use reduction
posted by  Yong Lee Low  on 

My project is a commercial building. All the fittings except Kitchen sink have been finalized.

2
Default Avatar
VP GM Commercial Business Unit
American Standard Brands
LEEDuser Basic Member
16 thumbs up
Fri Apr 1, 2011, 12:35 pm

Error Message when trying to select Complete

EBOM-2009 WEc1:Water performance measurement
posted by  Cynthia Fowler  on 

I get the following message when I try to click "Complete" for the credit: "...Form shows that documentation requirements have not been met..." I checked and rechecked and verified that all the doc

3
Default Avatar
SL+A INTERNATIONAL ASIA INC.
LEEDuser Premium Member
305 thumbs up
Fri Apr 1, 2011, 2:54 am

Enhanced CX 'Design Firm'

NC-2009 EAc3:Enhanced commissioning
posted by  Julianne Laue  on 

If a firm is a AE firm and are signing the arch drawings, but not involved in MEP...can an engineer in the firm be the CX?

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Wed Mar 30, 2011, 8:20 pm

Bike storage for residents with disabilities?

NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing rooms
posted by  Stefania Minotti  on 

I’m presently working on a mid-rise residential social housing building with 5 stories and 76 units. 67 of these apartments are 1 bedroom and 9 are two bedroom.

6
Wed Mar 30, 2011, 5:25 pm

Items to be implemented for EAc2.2

EBOM-2009 EAc2.2:Existing building commissioning - implementation
posted by  Mark Campbell  on 

It is clear that the low cost/no cost items uncovered during the investigation phase in EAc2.1 must ALL be implemented to satisfy the requirements of EAc2.2. My Question: Must ALL of the low-cost/

3
Default Avatar
VP
Chicago Metallic Corporation
LEEDuser Basic Member
42 thumbs up
Wed Mar 30, 2011, 11:36 am