Forum quick links
Designated area for smoking
CI-v4.1 EQc3:Construction Indoor Air Quality Management Planposted by Judy Chin on
On the IAQ management plans, I have to include a no-smoking plan that prohibits the use of tobacco products.
LT Credit High-Priority Site in outside the U.S
CS-v4 LTc3:High priority siteposted by INAE SUH on
Has anyone earned the credit about high priority site- Option2. Priority designation outside the U.S?
Multitenant complex classification
NC-v4.1 SSc3:Open Spaceposted by on
Hi,
Has anyone had any experience with zoos, aquariums, or other amusement parks? Specifically, classifying them as multitenant complexes?
Appliance and Process Water Use
NC-v4 WEc2:Indoor water use reductionposted by Edgar Arevalo on
Just so I'm clear about this particular requirement, do I need to satisfy efficiency compliant appliance(s) in order for the project to be allowed to achieve the maximum amount of points based off
SSc6: Light Pollution Reduction - decomposed granite or local rock materials
NC-v4.1 SSc5:Heat Island Reductionposted by Kevin Gilleran on
Hi,
I have a client who will be crushing rock native to the local site (winery) for hardscape pathways as well as pathways on a vegetated roof.
Do materials in building services count as 'permanently installed'?
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Cecilia Lopez-Cotarelo on
Do the materials used in the building services count a permanently installed materials when calculating the costs?
Waste Stream Audit AFTER Performance Period?
EBOM-v4 MRp1:Ongoing purchasing and waste policyposted by Heather Enos-Graves on
Once the performance period closed for our project, we realized that we did not divert 75% of ongoing waste as required by the prerequisite.
Does wallcoverings considered a "PRODUCT" by LEED?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Sara BENAYYAD on
Hello everybody,