Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Interior Project Water Performance

EBOM-v4.1 WEc1:Water Performance
posted by  yingling guan  on 

For interior project, if there is only one pantry faucet within the project scope.  And occupants of this project will use other indoor water fixtures or fittings installed out of the thi

1
Wed Apr 5, 2023, 1:59 pm

How to scrutiny the local testing agency's report for LEED Low emitting materials?

Retail-CI-v4.1 EQc2:Low Emitting Materials
posted by  Sagar Siripuram  on 

Hello, I've been having this doubt for many days, Just wanted clarity on this query. 

1
Fri Sep 9, 2022, 10:29 pm
5
Default Avatar
Sustainability/LEED Executive
co-energi (Pvt) Ltd.
LEEDuser Basic Member
7 thumbs up
Fri Aug 26, 2022, 12:50 pm

Compliant EPR Programs

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Amanda Tullos  on 

Has anyone had luck getting credit for a take back service program like Steelcase's (https://www.steelcase.com/services/#recycle

10
Senior Project Manager
Zinner Consultants
LEEDuser Basic Member
110 thumbs up
Thu Aug 25, 2022, 4:30 pm

building on campus with no smoking policy

CI-v4 EQp2:Environmental tobacco smoke control
posted by  Megan Valentine  on 

We are renovating a building on a campus. The campus has a no smoking policy with signage stating the policy at all entrances to the campus.

0

Campus approach: can we install water meter for the entire landscape, sanitaryware as a whole

NC-v4 WEc4:Water metering
posted by  Michael   on 

My project is a campus project, consisting of 4 individual buildings. To fulfill this credit, can I install 1 meter to monitor sanitaryware for 4 buildings together as a whole?

1
Thu Aug 25, 2022, 1:21 pm

PV Solar Panels outside LEED Boundary

NC-2009 EAc2:On-site renewable energy
posted by  Ammar Yahia  on 


A New Construction Project in which the PV panels to be installed on a "330,000 SQM roof of an airport terminal building project"  to offset 22% of annual energy cost.

1
Thu Aug 25, 2022, 12:50 pm

BPDO Material Ingredients: required to report material cost if pursuing Option 1?

CI-v4 MRc5:Building product disclosure and optimization - material ingredients
posted by  Adam Weiss  on 

Hello, if we are pursuing option 1 for MRc5 (20 compliant products from at least 5 manufacturers), are we required to report the cost of each material?

1
Fri Sep 2, 2022, 2:06 pm

How many sample locations for measurement?

CI-v4 EQc9:Acoustic performance
posted by  Brian Salazar  on 

I am looking to take mic measurements of the ambient noise in our space to provide a baseline for HVAC Background Noise.  The Acoustic performance Calculator specifies the following:

2
President, LEED AP, WELL AP
Entegra Development & Investment, LLC
LEEDuser Premium Member
43 thumbs up
Wed Aug 24, 2022, 3:29 pm

Do thermofusers count for controllability?

NC-v4 EQc5:Thermal comfort
posted by  Alaina Ladner  on 

Would thermofusers satisfy the requirements of controllability for this credit? I seem to have confirmation from LEED 2009, but don't really see a clear direction under v4 or v4.1 

1
Mon Sep 12, 2022, 12:56 pm