Forum quick links
Baseline System for a data center
CS-v4.1 EAp2:Minimum Energy Performanceposted by Narguess Kh on
I am working on a Data Center project which is located in Zone 4A. the project is assessed based on C&S. I am confused about the baseline building system selection.
Indoor plumbing fixtures and fittings, domestic hot water and dishwashers on the same supply line in tea kitchen
NC-v4.1 WEc4:Water Meteringposted by J Schütz on
Hello,
Energy Model - Alternative compliance for LEED V4.1 BD+C
NC-v4.1 EAc2:Optimize Energy Performanceposted by Amal Venugopal on
Hi All,
Has the Composting credit been achieved with limited composting receptacles in the building?
Pilot-Credits SSpc129:Comprehensive Compostingposted by Kristen Fritsch on
The amount or spacing of receptacles are not necessarily spelled out, as w/ the recycle bins, and mainly the only place I am drawing from that it should be provided in all spaces is in the "Require
CO2 monitoring in return air ductwork in a behavioral health facility
Healthcare-v4 EQc1:Enhanced indoor air quality strategiesposted by Bethany Beers on
We are currently designing a behavioral health inpatient facility in the Seattle area. Per local codes, demand control ventilation is required and is allowed in the return air ductwork for spaces.
Entryway System
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Summer Gorder on
Does the 10'-0" entrway requirement only apply to the main entry or all entries to the building?
glare-control devices for C&S
CS-v4.1 EQc4:Daylightposted by Francesco Passerini on
Hello, the reference guide states: "Provide manual or automatic (with manual override) glare-control devices for all regularly occupied spaces".
How to document thermal comfort in incomplete spaces within the project
NC-v4 EQc5:Thermal comfortposted by reham gamal on
Dear All,
Category of cooling for process load
CS-v4.1 EAp2:Minimum Energy Performanceposted by Narguess Kh on
How should I categorize the cooling required for IT equipment in data halls.