Forum quick links
Cold storage - Energy simulation
NC-v4 EAp2:Minimum energy performanceposted by Tien Duong on
Dear Leeduser,
Primer used in curtain wall application
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Tim Middleton on
We have a project with a primer being used for the installation of the exterior curtain wall.
General Emissions Evaluation criteria for flooring assemblies assembled off-site
NC-v4 EQc2:Low-emitting materialsposted by Jeff Wiedmeyer on
I've read through the posts related to this subject but for laminating adhesives and millwork. My question is similar but pertains to the requirement for a flooring assembly assembled off sit
Windows
NC-v4 EQc2:Low-emitting materialsposted by Joseph Snider on
When trying to achieve the wall panels category,the guide states windows should be included. So we include all windows on the project??
Watersense Labelled product not listed in EPA Product List
NC-v4 WEp2:Indoor water use reductionposted by Shannon Oletic on
We have received manufacturer documentation indicating that a lavatory faucet spec'd for one of our projects is WaterSense labelled however, this product is not listed within the EPA's Product
Greenguard Gold certificate
NC-v4.1 EQc2:Low-Emitting Materialsposted by Jyothsna Giridhar on
We got the following technical advice for a project:
Walkable Project Site
NC-v4 INc1:Innovationposted by Graciela Quiles Gonzalez on
Are facades of existing buildings (not historic) exempt of Requirement number 8 of the Walkable Project Site?
Designing with Nature - Stone indoor finishes
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by ANTONIO CERECEDA on
Currently we are working in a LEED project which we are pursuing this pilot credit of Designing with Nature, and we are wondering if natural stone vertical finishes on main indoor walls c
Safety First: Re-Enter Your Workspace
CS-v4.1 INc1:Innovationposted by Gustavo De las Heras Izquierdo on
Hello,
Has anyone achieved this credit yet? I so, you could share with us how many measures you implemented and if you received any review comments.
Thanks!
Project Energy Use_Electric or Overall Energy use?
NC-v4.1 EAc5:Renewable Energyposted by Hashir Usman on
Hi,