Forum quick links
Option 2/ Strategy E- Casework Included?
Retail-NC-v4 EQc6:Interior lightingposted by LUCY WILLIAMS on
Our "walls" have casework installed from finished floor to 36" above finished floor (since this is a retail space). Is the casework LRV (light reflectance value) to be included in the ca
Aluminum Flooring
CI-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Michelle Rosenberger on
Okay so what about aluminum flooring? It's not a mineral. So it doesn't appear to be explicitly excluded. Yet, there are no binders or resins to be concerned about.
Dwelling units monitoring
NC-v4 EQp1:Minimum indoor air quality performanceposted by Nicolas Martinez Ochoa on
Hello everyone,
Supporting Documentation
NC-v4 MRc5:Construction and demolition waste managementposted by Summer Minchew on
While the LEEDonline form does not specifically list this as a requirement, I have always uploaded the waste tickets/receipts as supporting documentation along with the MR CWM calculator
EQc - Indoor Air Quality Testing
Retail-CI-v4 EQc4:Indoor air quality assessmentposted by Roshni Lad on
Hello,
Lighting controls inside a dorm restroom
NC-v4 EAp2:Minimum energy performanceposted by Waleed AlGhamdi on
Section 9.4.1.2 Space Control indicates that restrooms must have an occupancy sensor. We have a dorm project where each two dormrooms has a shared bathroom.
Non compliant SRI/SR
NC-v4 SSc5:Heat island reductionposted by Charalampos Giannikopoulos on
Recently we have realized that the credit form allows adding materials with non-compliant SRI or SR.
Savings higher than 100% achieve 2 points?
NC-v4 WEc1:Outdoor water use reductionposted by Ricardo Sá on
Dear All,
Photos of Views
NC-v4 EQc8:Quality viewsposted by Summer Minchew on
Has anyone been successful in achieving this credit using photos as documentation to demonstrate view type compliance?
Heads Up! Reviewers may not round up from 9.99%
NC-2009 MRc5:Regional materialsposted by Lyle Axelarris on
I just received a review that did not award MRc5, because the Regional Material cost added up to 9.99%, not "the minimum of 10% required for one point."