Forum quick links
FTE calculation for hospital addition
Healthcare-v2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Richard Waite on
We are constructing an addition to a hospital. For this credit do we use a FTE number for the entire hospital staff, or an FTE number for just the addition?
Occupancy within the Minimum_IAQ_Performance_Calculator
Data-Centers-NC-v4 EQp1:Minimum indoor air quality performanceposted by Sarah Birchall on
For the occupancy within the Minimum_IAQ_Performance_Calculator, should this be based on maximum occupancy or general occupancy.
Recycled Material (Pre-consumer)
NC-2009 MRc4:Recycled contentposted by Nick Toon on
We have a supplier who is claiming that 70% of the the material contained in Iron ductile pipes are pre consumer recycled content. The 70% they are claiming is made entirely of iron ore fines.
Quantifiable metrics and thresholds for the credit
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by Esteban Martinez on
Hello,
Ergonomic Standards
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Brenda Parker on
Is there a website to view the ergonomic standards for workstations (BIFMA G1-2013, ANSI/HFES 100-2007, CSA Z412-00, ISO 9241-5:1998) without paying a fee?
U.S. Department of Energy’s (CBECS) database - data on the website
CI-v4 EAc6:Green power and carbon offsetsposted by Karen Elliott on
Dear All
Indoor Air Quality Procedure
NC-v4 EQp1:Minimum indoor air quality performanceposted by James Keohane on
I understand that the credit language requires the use of the Ventilation Rate Procedure(VRP) from ASHRAE 62.1-2010.
Issues with Private Lav Faucet in WEp2 Calculator
NC-v4 WEp2:Indoor water use reductionposted by RDK E&S on
Does anyone else notice a potential bug with the private lav faucet rows in the WEP2?
How many units needed for air testing.
Mid-Rise-v4 EQc2:Contaminant controlposted by Jillian Hansen on
I am working on a project that has one ventilation system and each of the 6 floors are less than 25,000SF.
Independent Living Units NOT Included??
NC-v4 EQc5:Thermal comfortposted by James Keohane on
Project Information: A LEED V4 New Construction project consisting of a three story clubhouse with Independent Living units on the upper four floors. The Cluhouse elements account for 6