Delegated Design of Irrigation with Split Review
NC-v4 WEp1:Outdoor water use reductionposted by Leanne Conrad on
We have delegated design of the irrigation system to the contractor but are pursuing the split review process.
Interpretation of the Net usable program area for area calculations
Healthcare-v4 SSc7:Places of respiteposted by Priscillia Champagne on
"Net usable program area" is defined as follow : the sum of all interior areas in the project available to house the project's program.
Non-Inpatient Floors - Total Floor Plate Area
Healthcare-v2009 IEQc8.2:Daylight and views - viewsposted by Irene Chung on
Hi,
Does anyone know if the total floor plate area for the Non-Inpatient Floors views calculations include the inpatient unit area?
100% Greenfield Site
NC-v4 SSc2:Site development - protect or restore habitatposted by Sofia Barahona on
If we are designing a project on a 100% greenfield land, therefore no previously developed area is present.
LEED v4 CI information
CS-v4 SSc7:Tenant design and construction guidelinesposted by Jamie Oates on
Hi all,
In an open office space, how to distinguish whether the type of workstation meets the definition of permanent indoor obstruction
NC-v4 EQc8:Quality viewsposted by Jingchao Qian on
There are questions about the quality view of open-plan office spaces. Vision types 1 and 3 require no permanent indoor obstructions. Refer to example 3 in the reference.
Installed and not Installed HVAC
CS-2009 EAp2:Minimum energy performanceposted by Paula Hernandez on
Hi,
I am modeling a C&S building for the Construction Submittal, and I have to adjust the Design Submittal Energy Model because the Owner change the brand of the VRF systems.
Rc value
NC-v4 EAc6:Enhanced refrigerant managementposted by Lise Dannesboe on
Hi
To caluclate the Rc-value we need to know the amount of refrigerant and the cooliing capacity. As LEED v4 puts it:
TI vs CS Scope Timing Gap
NC-v4.1 EAp2:Minimum Energy Performanceposted by Levi Jimenez on
We have a LEED NC v4.1 project that is currently in schematic design, and the Core Shell construction will be completed well before the TI scope. I recall reading somewhere that we only need