Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

NAF Plywood Source

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Brian Kaplan  on 

In an effort to reduce formaldehyde in casework and promote wood as a responsibly renewable resource, we're evaluating plywood products that visibly demonstrate the commitment to reduced toxicity a

0

Is a Non-Slip Flooring Treatment Applicable for credit calculations?

EBOM-v4 MRc3:Purchasing - facility maintenance and renovation
posted by  Andy Stein  on 

I am looking to see if a non-slip flooring treatment would be eligible to be included in the LEED Calculations and requirements for this credit.

1
Tue Dec 10, 2019, 12:08 am

Definition of Homes

ND-Plan-v4 GIBp2:Minimum building energy performance
posted by  Edmar Cabra  on 

We are developing a contraction village that will house contractors for the adjacent new development. The construction village will have accommodation units and support facilities (e.g.

3
Thu Dec 5, 2019, 12:00 am

Bird Collision Deterrence

Pilot-Credits SSpc55:Bird collision deterrence
posted by  Long Wang  on 

Hi, I have two questions of this pilot credit for our LEED EB: O+M project V4.

2
Wed Dec 4, 2019, 10:50 pm

Bicycle Storage for transitional housing for homeless

NC-v4 LTc6:Bicycle facilities
posted by  Summer Gorder  on 

I am working on a Behavioral Health Resource Center for Multnomah County, and I am not sure how to classify the occupants for the calculations.

1
Thu Dec 5, 2019, 4:05 pm

Monitoring : Natural Ventilation

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Premal Solanki  on 

We are working on a residential project (5-Story) that is being certified v4 BD+C. The dwelling units are naturally ventilated.

2
Director
Semtrio Sustainability Consulting
LEEDuser Basic Member
0 thumbs up
Wed Dec 4, 2019, 12:12 pm

EA CR 02 - Qualified List

NC-2009 EAc2:On-site renewable energy
posted by  SAMY Chamy  on 

Dear Concern:- I have some doubt in this credit 1.Off site renewable energy is Qualified for this credit 2.Is there any specific distance for off site (like kilometres / Miles) 3.Is there any poi

4
Default Avatar
Sr. Sustainable Design Specialist
HOK
LEEDuser Basic Member
1 thumbs up
Mon Dec 2, 2019, 6:01 pm

50% unbound

Healthcare-v4.1 SSc5:Heat Island Reduction
posted by  Lene Hill  on 

What does unbound mean? How is unbound determined?  Does a paver such as Unilock Eco-optilock meet that requirement?

0

Exemplary Performance

CS-v4 EAc2:Optimize energy performance
posted by  Maria Porter  on 

Is the Exemplary Performance threshold 54 % for CS as well (like NC?) The leap seems bigger for CS project than for NC Projects, based on that the table ends on 47 % for CS and 50 % for NC, both ac

2
Mon Dec 2, 2019, 2:21 pm

Energy model as per ASHRAE 90.1-2013

Retail-NC-v4 EAp2:Minimum energy performance
posted by  Vassil Vassilev  on 

Greetings,

We art to prepare an energy model for a project, which should be in accordance with ASHRAE 90.1-2013.

1
Mon Dec 2, 2019, 6:10 pm