Reasonable LEED Boundaries
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Marlen Aleman on
Hi, the scope of the project is to renovate the 3rd floor of a 5 storey building (all floors will be renovated eventually but the client wants to certify each floor as we go).
Impact of Landscaping on Water Consumption
EBOM-v4.1 WEc1:Water Performanceposted by Shri Kiruba on
Hello,
LEED online and simulation file
NC-v4 EAc2:Optimize energy performanceposted by Stephan Zweig on
Dear Leedusers,
I was wondering: At pltaform LEED online is it asked to upload the original output file from the energy simulation software in native format?
Door closer and door stopper
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Claudia Sturcz on
Dear All,
Reduced Parking Footprint Opt 4 - Unbundling Parking
NC-v4.1 LTc7:Reduced Parking Footprintposted by Rebecca Mann on
New options were introduced in v4.1 for LT Reduced Parking Footprint.
how do you manage providers that provide the right materials for LEED?
Pilot-Credits SSpc55:Bird collision deterrenceposted by kim sung on
Hello.
There is a question as a preliminary contractor for bird collision deterrence.
Biophilia and Renovations
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by Vanessa Hostick Rempe on
Are there any metrics available based on case studies for the pilot credit or related WELL criteria that venues or spaces which renovate using the biophilia concepts rent quicker or have a greater
Infra-red electronic basin mixer
CS-v4 WEp2:Indoor water use reductionposted by Hatice G. on
Dear all,
ASHRAE 5.4.3.4 vestibules
NC-v4 EAp2:Minimum energy performanceposted by Agnieszka Rylska on
Section 5.4.3.4 of ASHRAE 90.1-2010 requires enclosed vestibules at building entrances ("Building entrances that separate conditioned space from the exterior shall be protected with an enclosed ves