Forum quick links
Adding wings to a non-certified building
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Mario S. on
We have a case of an existing hospital building, and the owner now wishes to add 2 wings to it; one on its west side and the other on its east.
NC-2009 MRc5p regional Materials
NC-2009 MRc5:Regional materialsposted by Sayali G on
Hello All,
This is my first time handling the LEED documentation, and I am stuck with one part in the calculator for Regional Credit.
Is Manual Measurement acceptable?
NC-2009 EAc5:Measurement and verificationposted by Summer on
I would like to clarify if manual measurement is acceptable and compliant in this credit. We have a project that has BMS or building management system that can only monitors the HVAC consumption.
Non-certified buildings in LEED boundary
NC-v4 MPR2:Must use reasonable LEED boundariesposted by MERVE AYGENC on
Hi everyone,
PV installation built and commissioned prior to Occupancy
CI-v4 EAc4:Renewable energy productionposted by Gary Shlifer on
Our project is a 6 story office building, 250,000 sq feet. It is underconstruction.
Multi Scene Control for Lighting
NC-v4 EAp2:Minimum energy performanceposted by Gabriela Crespo on
Dear all, We're working on a LEED v4 NC project in Mexico.
Table 2 minimum compliance threshold
Schools-NC-v4 WEc2:Indoor water use reductionposted by Bryna Dunn on
I'm curious about whether other teams have had success with meeting the requirements of Table 2 in terms of the minimum amount of laundry that must be done per year to qualify for the point.
Master Site / Campus Innovation Credits
NC-v4 INc1:Innovationposted by Adam Fitzpatrick on
Can Innovation and/or Regional Priority credits be included in a campus master site submission? Or must these credits be awarded at the project level?