Forum quick links
parking spaces shared with adjacent multi-use complex
Hospitality-NC-v4.1 LTc7:Reduced Parking Footprintposted by Gail Napell on
We have a LEED NC_Hospitality project that has 15 off-site parking spaces SHARED with an adjacent multi-use complex. Do all requirements apply to these shared spaces? thank you!
Occupant Density Calculation for IEQc1
NC-2009 IEQc1:Outdoor air delivery monitoringposted by Keerthi Ratnayake on
There is a office room (100sqft) and the permanent occupancy is 1 person. In the layout, there are three chairs for the permanent worker and for two visitors.
European testing methods for US projects
NC-v4 EQc2:Low-emitting materialsposted by Kavita K on
Can US projects use products which show compliance with VOC emissions requirement through AgBB (European) testing? Or does it need to be CDPH only.
Documenting Option 2 Prescriptive Compliance
CI-v4 EAp2:Minimum energy performanceposted by Michelle Rosenberger on
We are seeing no requirement to document the ASHRAE compliance portion of the Prescriptive requirements.
Proposed Model U-Values
NC-v4 EAp2:Minimum energy performanceposted by Trey Randolph on
I have a college dormitory with 4" face brick, R7.5 ci, 6" metal stud on 16" centers, r19 closed cell spray foam and 5/8" gypsum. Per 90.1 Table A3.3 my u-value would be 0.06.
Trane Trace Reports
NC-v4 EAp2:Minimum energy performanceposted by Ciaran McCabe on
FPL OnCall in South Florida
NC-v4 EAc4:Demand responseposted by Joseph Snider on
In South Florida, our local utility, Florida Power & Light (FPL), has a program call Business On Call. They set it up so they can turn off your A/C for short periods of time..."up to 17.5
IEQp1 for Residencial Buildings
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Diego Escalona on
Hello, We have a 20-storey residential building, which will be naturally ventilated, so to meet IEQp1, naturally ventilated spaces shall be permanently open to the outside at a distance of 8 meter
Different requirements for projects w/ and w/o furniture?
NC-v4.1 EQc2:Low-Emitting Materialsposted by RDK E&S on
Are the credit requirements the same for projects with and without furniture in scope? My gut says "yes', but I wanted to confirm since v4 distinguishes them.