Locally Sourced materials definition

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Elizabeth Kertesz  on 

The reference guide says that products sourced (extracted, manufactured, purchased) within 100 miles of the site are valued at 200% of their cost.

15
Principal
husARchitecture
LEEDuser Premium Member
3 thumbs up
Thu Aug 8, 2019, 4:33 pm

MERV 11 in garage unit

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Johanna Koch  on 

Do you have to have MERV 11 filters installed in the ventilation unit that is connected to a garage?

0

Existing Building Fire Escapes - Building Square-footage

NC-2009 PIf2:Project Summary Details
posted by  Katherine Norris  on 

Our existing building relies on (2) metal fire escapes for emergency egress that we are not modifying.  They are full exterior, self supported, and only connect to the building with later

1
Wed Aug 7, 2019, 5:18 pm
1
Thu Jan 16, 2020, 12:20 pm

LVR wood stain and concrete sealer

CI-v4 EQc6:Interior lighting
posted by  Sue Bryant  on 

How do you find the LVR for these products? 

0

Waste Management Coordinator

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Akshay Padwal  on 

The person (program manager) who is coordinating waste management, do they have to be LEED certified? 

2
LEED Services Director
Group14 Engineering, Inc.
LEEDuser Premium Member
47 thumbs up
Wed Aug 7, 2019, 12:05 pm

Requirements for "Ongoing Feedback Mechanism"?

CI-v4 IPc1:Integrative process
posted by  Renee Shirey  on 

The requirement of "Briefly describe the planned method for gathering feedback on occupant satisfaction. Include information on sample sizes,

1
Tue Sep 3, 2019, 7:08 pm

1 EV charging station for 2 spaces and Vehicle Fueling Capacity per Station

CS-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehicles
posted by  Edgar Arevalo  on 

I was informed that the LEED project in question has 1 charging station and two reserved parking spots.  Am I to assume that this station has two charging cables, one for each spot, or should

5
Energy/Sustainability Engineer
ads ENGINEERS, DPC
LEEDuser Basic Member
21 thumbs up
Tue Aug 6, 2019, 8:12 pm