Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Compliance to ASHRAE 90.1-2010 - Dimming Lights

CS-v4 LTc7:Reduced parking footprint
posted by  Summer   on 

I'm working on an office project located at the top of a 3-level podium and has a 4-level basement parking.

0

Pumps in LEED Energy Models

CI-v4 EAc2:Optimize energy performance
posted by  Ciaran McCabe  on 
Hi, Is there a list of the pumps that's should be included in the Proposed Ashrae 90.1 LEED energy model. For example should cold or hot water pressurisation pumps be included?
1
Wed Aug 14, 2019, 12:08 am
4
Founder & Community Director
Metricorps
LEEDuser Expert
7783 thumbs up
Tue Aug 13, 2019, 5:26 pm

Monitoring-based Cx for CS projects

CS-v4 EAc1:Enhanced commissioning
posted by  Shannon Oletic  on 

What are the required measurement points for a core and shell project?

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Tue Aug 13, 2019, 5:09 pm
4
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
470 thumbs up
Tue Aug 13, 2019, 3:41 pm
1
Fri Aug 16, 2019, 5:50 pm
2
LEED AP ID+C & BD+C
Ecoteric Ltd
LEEDuser Basic Member
1 thumbs up
Sun Aug 11, 2019, 10:30 pm

Enhanced Commissioning

NC-v4 EAp1:Fundamental commissioning and verification
posted by  saif eddine majdaoui  on 

We are working on a big project, we are the LEED subcontractor (consultant) of the general contractor (All trades), 

3
Regional Director
Horizon Engineering Associates
LEEDuser Premium Member
40 thumbs up
Sun Aug 11, 2019, 9:49 pm
2
Sun Aug 11, 2019, 9:26 pm

LEED v4 CI EAb Opt. Energy Perf. : Option 2 : AEDG Maximum Project Size requirements

CI-v4 EAc2:Optimize energy performance
posted by  Kristen Callori  on 

Our project is an existing 300,000 sf Office building. Our client is both the new owner and will be the sole tenant.

1
Fri Aug 9, 2019, 8:53 pm