Forum quick links
entryway walk-off system in front of each retail shop in CS?
CS-2009 IEQc5:Indoor chemical and pollutant source controlposted by Alicja Bieszyńska on
Our project is a mixed use building where groundfloor constitutes retail services and floors from one up are for tenants. Taking into account that this is a CS certification, do we need to install
ASHRAE Level 1 Energy Audit
EBOM-v4.1 EAp1:Energy Efficiency Best Management Practicesposted by Ben McEwen on
Regarding the Energy Audit Prerequisite, is there an acceptable age range for a pre-existing energy Audit that was conducted on the building in question?
Total Building Energy Use
EBOM-v4.1 EAp3:Energy Performanceposted by Ben McEwen on
Regarding, EAc1, does it need to include non essential equipment that is on a sub-meter?
Heat pump and photovoltaics as District Energy System
NC-v4 EAc2:Optimize energy performanceposted by Giulia Guglielmo on
Building A is part of a complex of four buildings, but only the building A is subject of LEED certification.
Daycare - considered a school for bike rack calculations
Schools-NC-v4.1 LTc6:Bicycle Facilitiesposted by Keith Robertson on
We are working on a project where 2/3rd of the programmed space is for K-8 and 1/3 of the programming is dedicated to a daycare, Pre-K.
Best books to study for LEED?
NC-v4.1 IPc1:Integrative Processposted by Bruce Wright on
Please recommend good books to study for LEED certification.
ASHRAE 90.1-2010 Lighting Controls
NC-v4 EAp2:Minimum energy performanceposted by Gopinath Vasu on
Hi All,