2016 T24 energy code - v4_Minimum Energy Performance Calculator_v05 - how much of this needs to be completed
CI-v4 EAp2:Minimum energy performanceposted by Kevin Gilleran on
Hi,
Ending ESC Monitoring - what stage in construction?
NC-2009 SSp1:Construction activity pollution preventionposted by David Bell on
Hi, I'm curious whether the USGBC/CaGBC has a generally accepted endpoint to ESC monitoring on a construction project, or whether it is left to professional judgement. I.e.
On campus PV towards EAc1
NC-2009 EAc2:On-site renewable energyposted by komal kotwal on
We have a client pursuing LEED NC certification for a new building that will be an addition to an existing building on their campus.
Overventilation for Stack Effect
NC-v4 EAp2:Minimum energy performanceposted by on
I'm working on an energy model for a high-rise project in the Pacific NW that has office and residential, with residential being the top two-thirds of the building.
Core & Shell Data Center (saving from IT load in tenant spaces)
CS-v4 EAp2:Minimum energy performanceposted by Yoyo Shek on
Hi All,
Pilot Credit 82: Local Food Production as Innovation Credit
EBOM-v4 INc1:Innovationposted by Nicole Isk on
We're trying to achieve an Innovation credit for our EBOM Project and considering submitting a Pilot credit 82:Local Food Production/WELL Crédit 51 Food Production as Innovation credit as there's a
Cooling tower counted in WEp2?
NC-v4 WEp2:Indoor water use reductionposted by Hieu Huynh on
Hi LEED experts, my factory has a cooling tower but it's for manufacture process, not for the HVAC system. Will this type of Cooling tower be taken into account for this Prerequisite?
Renewable Energy unable to be commissioned due to delays, can we still submit for LEED review?
NC-2009 EAp1:Fundamental commissioning of building energy systemsposted by Rachel Manoguerra on
The project I am working on is "complete" and the owner wants to submit for final LEED review. However, the PV has been delayed and not installed on the project.
Enhanced Commissioning and Measurement and Verification
NC-2009 EAc3:Enhanced commissioningposted by Saju Varghese on
Hello, It been a little hard to draw the line between the enhanced commissioning scope and the measurement and verification scope.
Monitoring-based Cx frequency of analysis and approach clarification
NC-v4 EAc1:Enhanced commissioningposted by Kevin Day on
LEED reference manual states "MBCx can be accomplished via systems submetering, operational points trending, and real-time analyses, such as fault detection and sequence verification."