Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

G3.1.1 | Exception b (40 equivalent full-load hours per week)

CS-2009 EAp2:Minimum energy performance
posted by  Danilo Ilic  on 

From what I could see in related posts, "40 equivalent full-load hours per week" are plainly interpreted as 40 working hours and without any connection to thermal load and I am not

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Mon Apr 1, 2019, 1:39 pm

E-Waste - Safe recycling

CI-v4 MRp1:Storage and collection of recyclables
posted by  Peter Elliott  on 

Our IT department bids used computers, monitors and servers to e-waste liquidators. Is this considered an acceptable and safe recycling method for e-waste?

1
Mon Apr 1, 2019, 9:05 pm

Tenant lighting savings without layout

CS-v4 EAp2:Minimum energy performance
posted by  Przemysław Rejczak  on 

Dear Everyone,

Generaly for CS project we model tenant spaces as unfinnished and we use perimeter/core zonning method.

4
Fri Mar 29, 2019, 12:51 pm
1
Wed Jun 26, 2019, 7:06 pm

Glare-control devices - glazed doors?

CI-v4 EQc7:Daylight
posted by  Victoria Watson  on 

Hi - When the user guide says "provide glare-control devices for all transparent glazing" does it really mean all? I am assuming it doesn't mean high volume doors with transparent gl

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Thu Mar 28, 2019, 10:00 pm
3
President
Doo Consulting LLC
LEEDuser Basic Member
136 thumbs up
Thu Mar 28, 2019, 5:32 pm