Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Case 2 Option 2C

EBOM-2009 EAc1:Optimize energy efficiency performance
posted by  Patrick Cellie  on 

I am working with a convention center that is currently Silver certified under the v2009 EBOM rating system. 

3
Default Avatar
Sustainability Consultant
AECOM
LEEDuser Basic Member
0 thumbs up
Tue Jan 22, 2019, 9:14 pm

How to calculate multi-level Decks / Patios

NC-v4 SSc5:Heat island reduction
posted by  Sara Hickman  on 

The project will have several patios / decks throughout, many of which will be covered by a large cantilever above (being the building itself).

2
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Tue Jan 22, 2019, 8:39 pm

Flush-out - Hotel Facility

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Luis Andrade  on 

Hello,

I'm currently working in a project that is a hotel facility.

1
Tue Mar 5, 2019, 3:02 am

Construction and Demolition Waste Management Plan – Sample

CI-v4 MRc6:Construction and demolition waste management
posted by  milo valenti  on 

Construction and Demolition Waste Management Plan – Sample Are there template sample form in Excel format for our recycling yard?

3
Default Avatar
Green Building Consultant
LEEDuser Basic Member
20 thumbs up
Tue Jan 22, 2019, 7:51 pm

Schools - 2009 IEQp3 - STC requirement between Computer Lab and Elevator Shaft

Schools-2009 IEQp3:Minimum acoustical performance
posted by  Todd Bundren  on 

Does anyone know what the STC requirement is for a partition that separates a computer lab and an elevator shaft?

0

Intermittent ventilation

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Dustin Smith  on 

Has anyone successfully used scheduled intermittent ventilation for a constant-volume exhausted space to avoid overventilation, and to minimize energy usage, in a warehouse or similar space?

0

Full annual simulation - 365 days only?

NC-v4 EQc7:Daylight
posted by  Anna Korinkova  on 

Hello, 
I would like to clarify what exactly is meant by 'full annual simulation' for the sDA and ASE (Option 1 of the credit).

1
Wed Jan 23, 2019, 3:12 pm

Applying MRp2 retrospectively

NC-v4 MRp2:Construction and demolition waste management planning
posted by  André Harms  on 

A potential LEED project in Addis Ababa, Ethiopia, had already begun demolition and some construction activities before a LEED AP was appointed.

1
Tue Jan 22, 2019, 8:00 pm