Forum quick links
Pumps: Balancing Report HPs vs Design
NC-2009 EAp2:Minimum energy performanceposted by Gaston Viau on
Hi there
Core & Shell with HVAC as future / CI scope
NC-v4 EAp1:Fundamental commissioning and verificationposted by Stacey Olson on
If a project is a cold, dark shell without hot water, can commissioning be deferred as n/a or does a cxa still need to be engaged to preform OPR and BOD review?
Existing Building HVAC being upgraded and will serve new addition - LPB?
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Sue Bryant on
WE have a project that is an addition to an existing building. The addition is served by the HVAC from the existing building.
Maintaining 3rd Party
NC-v4 EAc1:Enhanced commissioningposted by Brett Farbstein on
I have had success acting as the fundamental & enhanced CxA as an employee of the project architect as long as the design team included an outside MEP engineer in v2009.&nbs
energy recovery control
CS-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
I’m modelling a System 8 baseline model according to ASHRAE 90.1-2010.
An exhaust energy recovery system is needed according to table 6.5.6.1.
Number of Parking Spaces Required by Local Code.
NC-2009 SSc7.1:Heat island effect - nonroofposted by Adrian Arenas on
Hello Everyone,
One quick question regarding SSc7.1
For Option 2, to comply with 50% of parking spaces undercover:
DES cooling load reduction
NC-v4 EAc4:Demand responseposted by Nuttanee Vongveeranonchai on
Dear all,
Number of points awarded for RP
NC-v4 RPc1:Regional priorityposted by Amrit Kaur on
How can I find out how points I would get for a particular RP. Is it always only one point if I pass the threshold?