Inspection reports vs photos?
NC-v4 EQc3:Construction indoor air quality management planposted by Erin Holdenried on
In v2009, inspection reports were sufficient documentation to confirm the implementation of the IAQ Mgmt Plan. Is this still acceptable? The LEED v4 reference guide only mentions photog
projects without HVAC.
Schools-NC-v4 EQp3:Minimum acoustic performanceposted by Víctor Ramírez Orozco on
Hello
Is there a stormwater management sample document/template for LEED v4?
CS-v4 SSc4:Rainwater managementposted by Qidi Jiang on
I noticed that the sample document provided in the documentation toolkit is applicable to LEED v2009, and not sample document for LEED v4 is available.
On - Site Solar Panels with in house Manually recorded sub metering
EBOM-2009 EAc4:On-site and off-site renewable energyposted by Robert Fernandez on
Hello,
Natural Ventilation Procedure - Prescriptive Path 62.1 2010
NC-v4 EQp1:Minimum indoor air quality performanceposted by Nicolas Martinez Ochoa on
Hello everyone,
LEED Interpretation 10231 still valid for v4?
NC-v4 SSc2:Site development - protect or restore habitatposted by CT G on
LEED Interpretation 10231 required a vegetated roof to be an intensive roof system, where the depth of the growing medium is 6 inches or more, and with at least six varieties of sedu
Install electric chargers by phases
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Instra Ingenieros on
We are pursuing in this credit the "Option 2: Providing onsite alternative fueling stations for 3% of total vehicle parking capacity is a bit more involved and potentially more expensive.
Manage Runoff from Entire Site Requirement
NC-v4 SSc4:Rainwater managementposted by Karina Lairet on
Per the USGBC Guide, it says that the project must manage rainwater runoff from the entire site within the project boundary.
Gender Neutral toilets
NC-v4 WEp2:Indoor water use reductionposted by Jude Chakraborty on
Hello, we are working on an University project which has a directive on Gender Neutral toilets which means there are no urinals in the building.
Room Geometry Adjustment - Baseline Lighting Power Increase
NC-v4 EAp2:Minimum energy performanceposted by Luis Andrade on
Hi,
When modeling the Baseline's lighting power using the Space-by-Space method, may I icrease the Baseline's power by section 9.6.3 (Room Geometry Adjustment) by 20% ( if applicable)?