Forum quick links
Fans cycling during unoccupied hours
NC-2009 EAp2:Minimum energy performanceposted by Gopinath Vasu on
Method to report proposed case Energy consumption - On site Gas Engine based electricity generation
NC-2009 EAp2:Minimum energy performanceposted by Rahula Attalage on
Dear All,
I have received the following comment by the reviewer:
Dual Flush Flow Rate
NC-v4 WEp2:Indoor water use reductionposted by Leanne Conrad on
We have a product data sheet for a dual flush toilet that states 6L/3L with an effective flush volume of 4L.
Hoarding dimensions
NC-v4 SSp1:Construction activity pollution preventionposted by Ahmed Labeeb on
Dear All,
Is there any LEED requirement regarding the hoarding dimensions ( distance from ground to the bottom of the panel)?
SSp2 Environmental Site Assessment
Schools-NC-v4 SSp2:Environmental site assessmentposted by Karly Michalowski on
I have a LEEDv4 for Schools project but is focusing on the interior restoration of the building and not site. Is Phase I ESA required for just interior restoration of the building?
Air Intake Minimum Separation Distance - dock
CS-2009 IEQp1:Minimum indoor air quality performanceposted by John Smith on
Dear all,
Roof deck entry mats?
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Erica Downs on
There have been a lot of earlier threads on this, but they are old and there does not seem to a definitive answer provided yet.
Not eligible if no non-potable water?
CI-v4 IPc1:Integrative processposted by emily reese moody on
It appears that a project may not be eligible for the 1 point associated with the Water Related System if their building(s) do not offer non-potable water sources. Is this correct?
Using CBECS 2012 Data for Estimating Energy Consumption
CI-v4 EAp2:Minimum energy performanceposted by Oliver Bate on
I have multiple office projects where there is no consumption data available as the tenants are new to the building- we are going with Option 2 Minimum Energy Performance.