CI-v4 EQc2:Low-emitting materialsposted by Michelle Rosenberger on
In the Step by Step guidance for Option1, one of the bullets says "furniture must be included, regardless of who specified or provided it." So does this mean that to achieve any low emitting pts, f
Selection of SHW system for baseline
NC-2009 EAp2:Minimum energy performanceposted by Francesco Passerini on
In the proposed system service hot water is heated in a water tank that is heated by a hot water loop that is connected with a gas boiler.
Baseline Economizser Requirement for Data Center Rooms
NC-2009 EAc1:Optimize energy performanceposted by Hirak Patel on
Hi, I am modeling Airport Traffic Control Tower project for LEED 2009 and I have question regarding economizer requirement. We have data center rooms which are served by CRAC units.
Furniture Category
NC-v4 EQc2:Low-emitting materialsposted by Michelle Rosenberger on
In Table 1 of the reference manual, there is a parenthetical comment next to furniture (include in calculations if part of scope of work).
Fuel in baseline when proposed design uses renewables for process energy
NC-v4 EAp2:Minimum energy performanceposted by Patrick Bivona on
Hello,
CBECS Data for the project without non-electricity fuel?
CI-v4 EAc6:Green power and carbon offsetsposted by Seth Lai on
The project is a CI retail project that only use electricity as energy supply. And we are going to use CBECS data to calculate the amounts of the Green Power and Carbon Offset.
entry way and air filtration
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by MARIA ESTHER LAMADRID on
Can entry way systems be located in the exterior but under canopy?
New FAQ added on using Revit
NC-v4 EQc7:Daylightposted by Paula Melton on
We've added a new Frequently Asked Question: Can I use Revit to document this credit?