Forum quick links
Historic District
NC-v4 LTc3:High priority siteposted by Ashlen Williams on
Our project site is determined to be eligible for the National Register of Historic Places. Does this eligibility satisfy the requirement? Thanks in advance for your feedback.
Parking spaces for projects logistics
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Anna Korinkova on
Our project is an exhibition center. Do we have to count parking spaces for exhibition logistics (incl. trucks, vans, supply deliveries ets.) into the LEV/FEV calculation? Thanks.
Prerinse spray valves in Europe
NC-v4 WEp2:Indoor water use reductionposted by Antti Karppinen on
Hi,
Vegetated roofs for Places of Respite Credit
Healthcare-v4 SSc7:Places of respiteposted by María Fernanda Aguirre on
Hello everyone: There is a huge hospital in Chile which is in design phase and wants to pursue LEED.
Residential Lighting
NC-2009 EAp2:Minimum energy performanceposted by Jorge Lopez de Obeso on
Hi Marcus, it seems that this is a real issue in this forum and I ended up more confused.
Help me get this thing right
First, lets clarify some basic concepts:
Fenestration assembly U value
NC-2009 EAp2:Minimum energy performanceposted by Sivarajah Ragulakeethan on
Dear All,
Lighting Controls in Unoccupied Spaces
EBOM-2009 EAc3.1:Performance measurement - building automation systemposted by Clint Fogg on
Good afternoon, I am working on credit EAc3.1 for an EBOM project in an Office Building built in 1904. I am looking for information with regards to the 100% lighting control statement.
Occupants for Multi-purpose Hall and Canteen
NC-2009 PIf3:Occupant and Usage Dataposted by Sjansie Lachica on
My project is a mixed-use building which consist a whole floor assigned as multi-purpose hall and another floor as canteen. Do we need to determine the number of occupants in multi-purpose hall?
Sample Site Assessment Plan
NC-v4 SSc1: Site assessmentposted by Levan Natadze on
Hello,
Has anybody a sample site assessment plan?
Asbestos removal
CI-2009 MRc1.2:Building reuse - maintain interior nonstructural elementsposted by Lauren Sparandara on
My project is removing asbestos that is included in a wall system and replacing the gypsum board but retaining the structural system beneath it.