Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

New Thermal Comfort Tool

NC-2009 IEQc7.1:Thermal comfort - design
posted by  Christopher Schaffner  on 

Just received an email about a new tool that may be helpful for teams pursuing this credit: The Center for the Built Environment has developed a web-based thermal comfort tool, which is now availa

6
Building Performance Analyst
The Green Engineer
LEEDuser Premium Member
11 thumbs up
Fri Mar 30, 2018, 2:53 pm
4
Default Avatar
LEEDuser Expert
472 thumbs up
Fri Mar 30, 2018, 2:50 pm

Sound Isolation for Regularly Occupied space next to an Electrical room

NC-v4 EQc9:Acoustic performance
posted by  Jill Kurtz  on 

If I have an conference room (occupied area) next to an electrical room, do I...

1
Wed Aug 8, 2018, 1:49 pm

The fan power consumption calculation of PSZ-HP system

Retail-CI-v4 EAp2:Minimum energy performance
posted by  JAMES CHEN  on 

questions:

1. Our current total area of ​​the model: Total Building Area: 191.5 m2, Net Conditioned Building Area: 141.90, Unconditioned Building Area: 49.60m2, 2 Floor

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Fri Mar 30, 2018, 1:10 am

Cutsheets for steel products

NC-2009 MRc4:Recycled content
posted by  Raquel Clemente  on 

In our project it is possible to achieve 30% recycled content only considering the default 25% recycled content value for steel structural products. My question is if we must provide cutsheets for

5
Sustainable Design Lead
CannonDesign
LEEDuser Expert
378 thumbs up
Thu Mar 29, 2018, 8:03 pm

Fenestration - Baseline vs. Proposed

NC-v4 EAp2:Minimum energy performance
posted by  Fábio Batista  on 

Hi all,

I have 3 questions to ask:

1.

1
Thu Mar 29, 2018, 6:06 pm

Documentation for Material Reuse?

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Megan White  on 

What is required for documentation of material reuse? In the Ref Guide (p.535), it says projects should track original location of the material before remove.

3
Thu Mar 29, 2018, 4:19 pm
2
Founder & Community Director
Metricorps
LEEDuser Expert
7783 thumbs up
Thu Mar 29, 2018, 3:27 pm

How to conduct Cost-Benefit Analysis

EBOM-v4 EAc7:Renewable energy and carbon offsets
posted by  Hamzeh Saqer  on 

I just need to know how to conduct the cost-benefit analysis (step 6) for a PV array on-site owned by a third party.

0

Modeling DOA in Baseline for residential project

NC-v4 EAp2:Minimum energy performance
posted by  Saif Abdulameer  on 

I am working on a small hotel that is served by VRF units and DOA unit which dehumidify and reheat the OA for the guest rooms, when creating the Baseline system (system 2 for this project) should i

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Thu Mar 29, 2018, 12:05 pm