Reuse of rainwater for irrigation
NC-2009 SSc6.2:Stormwater design - quality controlposted by Aneta Firląg on
Hello, on our project the runoff from roof area is directed to one concrete reservoir tank. Water is stored in rainwater cistern and reused for irrigation.
Office/Industrial Mix - AEDG for Small to Medium Office Buildings
CI-v4 EAc2:Optimize energy performanceposted by Martin Meehan on
Hello
I am working a building which is part office (30% of building area) and light industrial (70% of building area).
The overall area is approx 3000 m2.
End use with multiple fuels
Retail-CI-v4 EAc3:Advanced energy meteringposted by Jared Silliker on
I'm working on a grocery project. Cooking will be a significant energy load, exceeding 10%, and will be gas-dominant.
Server Virtualization Documenation
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Annie Levan on
Hello, I have a client that will be using server virtualization for their new data center but does not wish to share the server product information.
What is the base building service water?
CI-v4 EAc3:Advanced energy meteringposted by JASON NIEN on
In the LEED CI V4 standard. Base building service water heating does not need to be metered.So someone can tell me what kind of use belongs to base building service water, thanks advance.
water consumption calculations for Irrigation
CS-2009 WEc1:Water efficient landscapingposted by Selvarasu M on
Hi,
The following are the queries with respect to irrigation calculations:
Domestic Hot Water Baseline Equipment Type
Healthcare-v4 EAp2:Minimum energy performanceposted by junaid naseer on
Dear All,
Green-e endorsed carbon offset equivalent
NC-v4 EAc7:Green power and carbon offsetsposted by Conny Waltemath on
Hello - new to the site.
Interior Lighting Controls - Daylighting Controls
CI-v4 EAc2:Optimize energy performanceposted by Michael Archer on
The credit states the following: Install daylight-responsive controls in all regularly occupied daylit spaces within 15 feet (4.5 meters) of windows and under skylights for at least 25% of
Demolition includes Mechanical and Electrical equipment
NC-v4 MRc5:Construction and demolition waste managementposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on
Assume a building to be demolished has large HVAC equipment and electrical gear, etc., and is not being reused but discarded.