Forum quick links
100% Previously Developed Site with National trees
NC-v4 SSc2:Site development - protect or restore habitatposted by Ahmed Labeeb on
We are working on a project located in Dubai, UAE. The total site area was previously developed by an old owner.
Calculation of Volume of Captured Runoff
CS-2009 SSc6.1:Stormwater design - quantity controlposted by Himanshu Agarwal on
I am working on Core & Shell Office Building Bangladesh where my Site Area is 4434.71 square feet.
NPDc8 - Option 2 / Define "Occupants"
ND-v2009 NPDc8:Transportation demand managementposted by Stacey Olson on
This option indicates transit passes must be provided to project "occupants". Are "Occupants" FTE, residents, or inclusive of 100% of people who come to the site?
Classroom adjacent to Stair
Schools-2009 IEQc9:Enhanced acoustical performanceposted by Casey Kuntz on
Next to one of my classrooms is a stair shaft. On the other side of this same stair is "Outside". How do I show this in the table?
Runoff calculations & rainwater harvesting
EBOM-v4 SSc2:Rainwater managementposted by Gail Vittori on
If I can calculate the volume of runoff using the site impervious area in square feet and the 95th percentile rainfall over 24 hours in inches, do I also need to use one of the tools identifie
Shop-applied primer/touch-up paint for field
NC-v4 EQc2:Low-emitting materialsposted by Shaunna Shaw on
I work for a structural steel contractor working on our first LEED v4 project and we are having difficulty getting our standard shop primer approved by the GC. The paint does not meet th
Renewable fuels and "green" natural gas?
CS-v4 EAc7:Green power and carbon offsetsposted by Adolfo Silva on
Is it possible to account for externally-produced renewable fuels in the "total energy use" calculation?
Office, conference room to Hallway, stairs STCc Interpretation
CI-v4 EQc9:Acoustic performanceposted by Jeffrey Fullerton on
In this credit, there is a requirement for an STCc 50 rating for "Office, conference room" to "Hallway, stairs".
How to calculate the Tank size
NC-v4 SSc4:Rainwater managementposted by Patrick Y P Lui on
I am working a hotel project with 6090 sq.m greenery + 14210 sq.m pavement and willing to get 3 points by Percentile of rainfall events (Option 1) - Path 2 98th Percentile.
BE CxA - Rules and Regulations? Who can do it?
Retail-NC-v4 EAc1:Enhanced commissioningposted by Brian Salazar on
Do the same restrictive rules apply to the Building Envelope CxA as they do to the MEP CxA? I don't see any detail about this on the USGBC site.