Preserve and protect from all development and construction activity 40% of the greenfield area on the site
NC-v4 SSc2:Site development - protect or restore habitatposted by Jason Garvens on
I'm hoping someone can make this requirement interpretation crystal clear for me as I'm struggling to fully grasp what it mean.
RP Credit Lookup: Invalid Location in the City
Retail-CI-v4 RPc1:Regional priorityposted by Marjorie Oblinada on
Hi. My team is currently working on certifying a LEED v4 ID+C:Retail project and wishes to pursue the regional priority credits to gain additional points.
Cost of permanently installed products - use default 45%?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Deborah Lucking on
I have not been able to find any guidance on this - is it still acceptable to use the default of 45% of the contract value to determine total material cost?
Modeling Mechanical Systems for Core Areas
CS-v4 EAp2:Minimum energy performanceposted by Chris Hammett on
I am working on a project that includes some limited core areas such as lobby, electrical rooms, restrooms, etc. and spaces allocated for future tenants.
IEQ CREDIT 4.3
CS-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Carlos Salas on
hola, en un ensayo de emisiones COV, ¿el formaldehido se debe tener en cuenta? Un suelo técnico formado con una madera encapsulada metalica, debe cumplir el test CPHD?
Gracias.
Lighting power allowance - loading bays
NC-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
I am current working on a project looking for certification under LEED V4.
Daylighting controls for primary sidelighted areas for baseline
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
In the refurbishment that was designed internal partitions will be removed and the rooms will become bigger than the existing ones.
Compliance in early construction
NC-v4 SSp1:Construction activity pollution preventionposted by ARDOR GREEN on
Dear all,
Recharging Stations - Off-site parking
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Jay Murray on
This project is a new 33 story hotel/condo in Boston. There is no parking garage in the building.