Provide a transportation for pick up/ drop off employees
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Hanh Truong on
Dear all, I have a factory project located in a remote area which does not have public transportation service.
Different type of spaces in a same AHU
Healthcare-v2009 IEQp1:Minimum indoor air quality performanceposted by Paula Hernandez on
We are working on a Healthcare project, and we have several AHUs serving both healthcare spaces, calculated according ASHRAE 170, and common spaces included in ASHRAE 62.1 standard.
Verified Construction & Demolition Recycling Rates Pilot
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Juliana Moreira on
I am working on a commercial interiors project in London-UK. The standard for construction waste most commonly used in the UK is the PAS 402.
100% Previously Developed Site with National trees
NC-v4 SSc2:Site development - protect or restore habitatposted by Ahmed Labeeb on
We are working on a project located in Dubai, UAE. The total site area was previously developed by an old owner.
Calculation of Volume of Captured Runoff
CS-2009 SSc6.1:Stormwater design - quantity controlposted by Himanshu Agarwal on
I am working on Core & Shell Office Building Bangladesh where my Site Area is 4434.71 square feet.
NPDc8 - Option 2 / Define "Occupants"
ND-v2009 NPDc8:Transportation demand managementposted by Stacey Olson on
This option indicates transit passes must be provided to project "occupants". Are "Occupants" FTE, residents, or inclusive of 100% of people who come to the site?
Classroom adjacent to Stair
Schools-2009 IEQc9:Enhanced acoustical performanceposted by Casey Kuntz on
Next to one of my classrooms is a stair shaft. On the other side of this same stair is "Outside". How do I show this in the table?
Runoff calculations & rainwater harvesting
EBOM-v4 SSc2:Rainwater managementposted by Gail Vittori on
If I can calculate the volume of runoff using the site impervious area in square feet and the 95th percentile rainfall over 24 hours in inches, do I also need to use one of the tools identifie
Shop-applied primer/touch-up paint for field
NC-v4 EQc2:Low-emitting materialsposted by Shaunna Shaw on
I work for a structural steel contractor working on our first LEED v4 project and we are having difficulty getting our standard shop primer approved by the GC. The paint does not meet th
Renewable fuels and "green" natural gas?
CS-v4 EAc7:Green power and carbon offsetsposted by Adolfo Silva on
Is it possible to account for externally-produced renewable fuels in the "total energy use" calculation?