Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Reviewers are not paying attention

NC-v4 SSc6:Light pollution reduction
posted by  Bill Swanson  on 

Just got the review comments back on a project.

For Uplight, Option #1 was selected.  BUG rating of fixtures was provided.

2
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
470 thumbs up
Mon Jan 22, 2018, 3:46 pm
2
Sat Jan 20, 2018, 1:09 am

Community choice aggregation (CCA) programs?

NC-v4 EAc5:Renewable energy production
posted by  Kristen Magnuson  on 

San Francisco's Public Utility Commission offers a currently-optional program called Clean Power SF. Electricity for the program is supplied by local renewable sources.

3
Fri Jan 19, 2018, 10:36 pm

How Close for Cycles of Concentration

NC-v4 WEc3:Cooling tower water use
posted by  Nathan Gauthier  on 

The credit is pretty vague about defining the "maximum number of cycles without exceeding any filtration levels". Does this need to be exact (to the gallon over a year)?

0

Calculation of Rc in 4-pipe air-source heat pumps

NC-2009 EAc4:Enhanced refrigerant management
posted by  Ricardo Sá  on 

I have a project with an air-source heat pump that can either do heating, cooling or simultaneous heating and cooling (4 pipes).

3
Default Avatar
Director of Sustainability
Edifícios Saudáveis Consultores (503 910 767)
LEEDuser Basic Member
79 thumbs up
Fri Jan 19, 2018, 6:23 pm

Average Weekend Trips

NC-v4 LTc5:Access to quality transit
posted by  Brendan Isard  on 

We have a project which a bus line provides (15) trips on a Saturday and (11) trips on a Sunday, with an average of (13) trips between the (2) days.  The credit language states that an average

8
Fri Jan 19, 2018, 5:01 pm

Use of a WELL credit as ID?

NC-2009 IDc1:Innovation in design
posted by  Devyn Olson Sawyer  on 

Our team is have been reviewing WELL and are considering completing a WELL credit in our LEED project.

1
Fri Jan 19, 2018, 5:57 pm

Eye Height above 42" for Standing Desks?

CI-2009 IEQc8.2:Daylight and views - views
posted by  Annalise Reichert  on 

I am working on a project that plans to install cubicles with partition heights approximately 5 feet high, likely blocking views from seated height of 42" aff.

3
Fri Jan 19, 2018, 12:42 pm

MBCx Duration

CI-v4 EAc1:Enhanced commissioning
posted by  David Edenburn  on 

The LEED text only discusses what must be done in the first year. Is there any specific term that the MBCx must be done? In other Cx schemes they require two years, life of building, etc.

1
Wed Jan 24, 2018, 8:32 pm

Recycling not provided for building

CI-v4 MRp1:Storage and collection of recyclables
posted by  Katherine Roth  on 

Requirements state, "Provide dedicated areas accessible to waste haulers and building occupants for the collection and storage of recyclable materials for the entire building." To meet the prerequi

1
Wed May 9, 2018, 8:40 pm