Forum quick links
Reviewers are not paying attention
NC-v4 SSc6:Light pollution reductionposted by Bill Swanson on
Just got the review comments back on a project.
For Uplight, Option #1 was selected. BUG rating of fixtures was provided.
Residential Bicycle Storage Inside Unit
NC-v4 LTc6:Bicycle facilitiesposted by Kristen Magnuson on
Hello,
Community choice aggregation (CCA) programs?
NC-v4 EAc5:Renewable energy productionposted by Kristen Magnuson on
San Francisco's Public Utility Commission offers a currently-optional program called Clean Power SF. Electricity for the program is supplied by local renewable sources.
How Close for Cycles of Concentration
NC-v4 WEc3:Cooling tower water useposted by Nathan Gauthier on
The credit is pretty vague about defining the "maximum number of cycles without exceeding any filtration levels". Does this need to be exact (to the gallon over a year)?
Calculation of Rc in 4-pipe air-source heat pumps
NC-2009 EAc4:Enhanced refrigerant managementposted by Ricardo Sá on
I have a project with an air-source heat pump that can either do heating, cooling or simultaneous heating and cooling (4 pipes).
Average Weekend Trips
NC-v4 LTc5:Access to quality transitposted by Brendan Isard on
We have a project which a bus line provides (15) trips on a Saturday and (11) trips on a Sunday, with an average of (13) trips between the (2) days. The credit language states that an average
Use of a WELL credit as ID?
NC-2009 IDc1:Innovation in designposted by Devyn Olson Sawyer on
Our team is have been reviewing WELL and are considering completing a WELL credit in our LEED project.
Eye Height above 42" for Standing Desks?
CI-2009 IEQc8.2:Daylight and views - viewsposted by Annalise Reichert on
I am working on a project that plans to install cubicles with partition heights approximately 5 feet high, likely blocking views from seated height of 42" aff.
MBCx Duration
CI-v4 EAc1:Enhanced commissioningposted by David Edenburn on
The LEED text only discusses what must be done in the first year. Is there any specific term that the MBCx must be done? In other Cx schemes they require two years, life of building, etc.
Recycling not provided for building
CI-v4 MRp1:Storage and collection of recyclablesposted by Katherine Roth on
Requirements state, "Provide dedicated areas accessible to waste haulers and building occupants for the collection and storage of recyclable materials for the entire building." To meet the prerequi