Best replicating natural site hydrology processes
NC-v4.1 SSc4:Rainwater Managementposted by Allen Cornett on
If the rainwater that is captured and used for flush fixtures meets the percentile thresholds can this credit be successfully attemtped? If the rainwater is used for the flush fixtures it wou
Single LEED building in Zoo: Demand Response Plan required for entire Zoo?
NC-v4 EAc4:Demand responseposted by Joyce Kelly on
Wondering if the Demand Response Plan needs to address the entire Zoo the way Parking, Green Vehicles credits must.
Energy Modelling Software
NC-v4 EAp2:Minimum energy performanceposted by Eliane Krugman on
Hi everyone,
I'm wondering what is the most common software for energy modelling ASHRAE 90.1
Energy Star Commercial Washer
NC-v4.1 WEp2:Indoor Water Use Reductionposted by Michael Mantai on
We have a project that includes commercial washers. The basis of design is a top load light commercial washer. From the Energy Star website, a top load commercial washer is not eligible
Select Different Options for Multi-Tenant Buildings?
EBOM-v4.1 MRc1:Purchasingposted by Mel K on
Hello,
Can different options be selected under this credit if there are multiple tenants in the building?
Composite wood - Compliance with CARB ATCM or TSCA Title VI is not enough?
NC-v4.1 EQc2:Low-Emitting Materialsposted by Michael on
Hi LEED experts,
Including space in the the project boundary where only one trade is included in scope
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Edgar Arevalo on
I have an ID+C project that takes up approximately half of a floor in a building. When laying out the LEED project boundary, I was confused as to whether to include the restrooms, since it wa
Waste-to-Energy Clarification
NC-v4 MRc5:Construction and demolition waste managementposted by Jenni Huynh on
Hi folks,
I had inquired about waste-to-energy as being counted towards waste diversion regarding the Construction + Demolition Waste Mgmt prereq/credit and GBCI said the following:
If sub-ing all NC-v4.1 for MR credits, then is NCv4-MRp2 still required if registered as v4?
NC-v4 MRp2:Construction and demolition waste management planningposted by Laura Stanley on
Has anyone encountered this situation, and been allowed to skip the MRp2 credit since it was omitted in NC-v4.1 in 11/2020?