No BAS.

EBOM-2009 IEQc2.3:Occupant comfort - thermal comfort monitoring
posted by  Melissa Young  on 

As it says above, achieving this credit without a BAS is difficult. What exactly needs to be done if we don't have a BAS?

1
Tue Feb 8, 2011, 5:28 am

Do reused Hospital beds qualify for furniture reuse credit?

CI-2009 MRc3.2:Materials reuse - furniture and furnishings
posted by  Bryan Waters  on 

We would like to pursue this credit, as our hospital floor renovation project registered under LEED CI v 2.0 is reusing all patient beds.

1
Mon Jan 31, 2011, 9:23 pm

Baseline Fan Power: PFP and AHU Pressure Rises

NC-2009 EAp2:Minimum energy performance
posted by  Rodrigo Perez  on 

We’re working on a 20 stories building that is seeking LEED NC v3 certification. This building considers ASHRAE’s #8 HVAC baseline system: VAV w/ PFP boxes.

1
Fri Feb 11, 2011, 10:42 pm

Distance between buildling entrance and bicycle storage

CS-2009 SSc4.2:Alternative transportation - bicycle storage and changing rooms
posted by  William Wong  on 

I read from Reference Guide that there is distance requirements (200 yards from building entrance) for location selection of bicycle storage for case 1 (commerical or institutional project 300,000

1
Tue Feb 1, 2011, 5:09 pm

High-rise towers

Pilot-Credits PC23:Quality Views
posted by  Elena Verani  on 

Would a high-rise tower be compliant with credits requirements? From the upper floors one would only see the sky outside vision glazing. Would this be enough?

1
Tue Feb 1, 2011, 6:22 pm

Restroom ventilation

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Alexia Anastassiadis  on 

We are working on a major renovation project and the restrooms have natural ventilation. Do we have to provide additional mechanical exhaust to comply with ASHRAE?

1
Thu Feb 24, 2011, 9:04 pm

CS projects should have 75% of GFA to earn this credit?

EBOM-2009 SSc1:LEED certified design and construction
posted by  Bazeeth Ahamed Khader Mohamed Ali  on 

75% of "leasable area" makes more sense here. How do we communicate our suggestions to USGBC. Kindly let me know if there is a way.

1
Tue Feb 8, 2011, 5:03 am

Industrial Plant Manufacturing Hall Ventilation

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Sustainability Provider  on 

We are currently working on the design of an industrial plant (aluminum casting in specifics) with two sections - manufacturing hall and administrative/engineering offices.

1
Thu Feb 24, 2011, 8:54 pm

Energy Star Space Allocation

EBOM-2009 EAp2:Minimum energy efficiency performance
posted by  Ed Okon  on 

Good Afternoon I'm currently composing a plan for LEED EB on an existing manufacturing campus comprised of multiple building types (warehouse, shipping and receiving facility, manufacturing, office

1
Tue Feb 8, 2011, 7:37 pm

Sample Calculations

NC-2009 WEc2:Innovative wastewater technologies
posted by  Craig Phillips  on 

I am finding it hard to locate a 1.0 or a dual flush 1.6/.8 toilet and flushometer. Where did the data come from in the sample calculations? Lyn

1
Tue Feb 8, 2011, 3:05 am